Skip to main content

Durisol barrier passes MASH TL-4 crash test

The aluminium noise wall barrier is prefabricated and has tongue and groove assembly.
By David Arminas February 23, 2021 Read time: 2 mins
The test used a 10,206kg box truck at a speed of 93km/h and a 15° impact angle

Durisol reports that its aluminium noise wall barrier has passed the MASH (Manual for Assessing Safety Hardware) TL-4 crash test in the US.

The structure-mounted noise barrier was first designed by the roadside safety experts at Safe Roads Engineering, a safety engineering consultancy based near Toronto, Canada. A mock wall was then erected at the test site, and the crash test was completed in early December, conducted by third-party provider Texas A&M Transportation Institute at their proving ground in College Station in the US state of Texas.

The MASH TL-4 testing criteria is dictated by AASHTO - the American Association of State Highway and Transportation Officials. To replicate worst practical conditions, the crash test is conducted with a 10,206kg (22,500lb) box truck at speeds of 93km/h (58.5mph) and at a 15° impact angle. A link to the crash-test video can be viewed here.

“Durisol’s aluminum noise barrier system provided excellent vehicle stability,” said Dean Alberson, senior research engineer at Safe Roads Engineering. “Despite the severity of the impact of the crash, the wall panels remained in place and intact, without flying debris and minimal damage.”

“By completing these tests, we can pass that peace-of-mind onto our customers,” said Mark Van Bakel, president of Durisol.

The lightweight, ready-made system is prefabricated, with the additional installation advantage of a tongue and groove assembly. When working alongside live traffic lanes, a quicker installation means a safer job for installers.

The barrier is built with perforations and a sound-absorbing mineral wool interior to respond to specific noise absorption and/or reflection mitigation requirements. It has double-sided noise absorption up to NRC 0.90. The product has also been tested for freeze-thaw and scaling.

The company offers other precast and transparent MASH-compliant TL-3 and TL-4 crash-tested noise barrier systems. Durisol has an in-house engineering team to design all noise barrier systems alongside its client partners.

Related Content

  • Industry AMS develops safe end treatment technology
    December 3, 2014
    Italian firm Industry AMS has improved its range of guard rail and end treatment technologies. The firm’s latest SMA 100 crash cushion is claimed to offer the best performance characteristics in its class and features reduced dimensions, stability and high functionality.
  • Canada: Ring of Fire road debate heats up
    September 6, 2016
    A 400km road built specifically into the Canada’s isolated but mineral-rich Ring of Fire region could cost between US$204-$443 million, according to a government-funded study. The road, entirely in the province of Ontario, would start in the port of Thunder Bay at the head of the Great Lakes and run northeast to the James Bay area, just south of Hudson Bay.
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very
  • Highways England goes green with Mobilane Green Screens
    May 22, 2018
    Highways England has installed a “green bridge” as part of the US$242 million A556 Knutsford to Bowdon dual carriageway project. Mobilane Green Screens are part of the innovative new feature. The project to improve links between the M6 and M56 includes seven new bridges plus a pedestrian underpass along the 7.3km new road. Other work includes concrete retaining walls and repairs to two existing bridges. The new dual carriageway will make travelling between the M6, south Manchester and Manchester Airport q