Skip to main content

Durisol barrier passes MASH TL-4 crash test

The aluminium noise wall barrier is prefabricated and has tongue and groove assembly.
By David Arminas February 23, 2021 Read time: 2 mins
The test used a 10,206kg box truck at a speed of 93km/h and a 15° impact angle

Durisol reports that its aluminium noise wall barrier has passed the MASH (Manual for Assessing Safety Hardware) TL-4 crash test in the US.

The structure-mounted noise barrier was first designed by the roadside safety experts at Safe Roads Engineering, a safety engineering consultancy based near Toronto, Canada. A mock wall was then erected at the test site, and the crash test was completed in early December, conducted by third-party provider Texas A&M Transportation Institute at their proving ground in College Station in the US state of Texas.

The MASH TL-4 testing criteria is dictated by AASHTO - the American Association of State Highway and Transportation Officials. To replicate worst practical conditions, the crash test is conducted with a 10,206kg (22,500lb) box truck at speeds of 93km/h (58.5mph) and at a 15° impact angle. A link to the crash-test video can be viewed here.

“Durisol’s aluminum noise barrier system provided excellent vehicle stability,” said Dean Alberson, senior research engineer at Safe Roads Engineering. “Despite the severity of the impact of the crash, the wall panels remained in place and intact, without flying debris and minimal damage.”

“By completing these tests, we can pass that peace-of-mind onto our customers,” said Mark Van Bakel, president of Durisol.

The lightweight, ready-made system is prefabricated, with the additional installation advantage of a tongue and groove assembly. When working alongside live traffic lanes, a quicker installation means a safer job for installers.

The barrier is built with perforations and a sound-absorbing mineral wool interior to respond to specific noise absorption and/or reflection mitigation requirements. It has double-sided noise absorption up to NRC 0.90. The product has also been tested for freeze-thaw and scaling.

The company offers other precast and transparent MASH-compliant TL-3 and TL-4 crash-tested noise barrier systems. Durisol has an in-house engineering team to design all noise barrier systems alongside its client partners.

Related Content

  • Lower noise surfaces under spotlight
    July 31, 2012
    Research is paramount in the development of better roads and safety. In a new series, Eurofile looks at the work and programmes of organisations dedicated to that end. In this issue: The German Federal Research Institute (BASt) The aims of BASt (an arm of the Federal Ministry of Transport) are to improve the cost-effectiveness of building and maintaining federal trunk roads, to increase the safety of road transport, to reduce the environmental impact produced by road traffic and construction and to improve
  • Eradicating work zone danger
    June 26, 2013
    New safety systems for highway work zones are helping to reduce deaths and injuries in the United States, while much work is being done in Europe to improve work zone safety. Guy Woodford reports. With more road building underway than at any one time in Texas history, the US Lone Star state’s Department of Transportation (TxDOT) is introducing its first highway safety system with queue-warning technology and temporary rumble strips to cut work zone collisions. Debuting along a central Texas stretch of the
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.