Skip to main content

Double sided duty

Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.
February 13, 2012 Read time: 2 mins
Highway Care says its new end treatment system requires fewer parts than existing products, allowing for speedy installation, low repair costs and lower lifetime costs
1529 Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.

This system is versatile as it can be used for left hand and right hand applications and also has a number of foundation installation options. The Xtension 110 Double-sided P4 Terminal is a tension based system and is said to be simple and robust. When installed as a driven post system, it also offers a cost-effective solution. The Xtension 110 Double-sided P4 Terminal provides a safe termination for barriers acting as an alternative to conventional double ramped end terminals. Its overall length and low displacement make it particularly suitable for use in restricted sites. The Xtension 110 Double-sided P4 Terminal is tested to EN1317- 4, approved for use on 2309 Highways Agency roads and can be used without a Departure from Standard. Under test, the system proved its capability by redirecting a 1.5tonne vehicle. The impacting vehicle pushes against the impact head smoothly transferring the energy into longitudinal cables which are located behind the system beams. The resistance between the impact head and the cable dissipates the energy during the rearward motion and brings the vehicle to a progressive, controlled halt. The system can be connected directly to W beam barrier systems of N2 containment and W2 working width.

For more information on companies in this article

Related Content

  • Liebherr’s truck-mounted 37 Z4 XXT concrete pump
    February 19, 2015
    A truck-mounted concrete pump configured in four sections, Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site. The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the le
  • Liebherr’s truck-mounted 37 Z4 XXT concrete pump
    January 6, 2017
    A truck-mounted concrete pump configured in four sections, Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site. The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the le
  • UK Roads Crash Demo Day is a Big Hit
    July 19, 2012
    Representatives from local authorities, the police, and the highway safety-related business world attended last month’s UK Roads Crash Demonstration Day at MIRA near Nuneaton, in central England. Guy Woodford reports It was never meant to be an occasion for crash test dummies. And each of the latest road safety solutions from leading highway technology companies tested at the UK Roads Crash Demonstration Day passed with top marks. A crowd of over 100 enjoyed the high impact, minimum damage action.
  • Longer lasting road surfaces with advanced asphalt paving
    February 20, 2012
    Contractors face an array of sophisticated paving technologies, Mike Woof reports. Asphalt paving technology continues to advance as manufacturers develop more efficient and reliable equipment. Paving techniques are also improving, while new polymer modified bitumen materials and recycling methodologies further increase the range of road surfacing options available to the client and contractor.