Skip to main content

Double sided duty

Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.
February 13, 2012 Read time: 2 mins
Highway Care says its new end treatment system requires fewer parts than existing products, allowing for speedy installation, low repair costs and lower lifetime costs
1529 Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.

This system is versatile as it can be used for left hand and right hand applications and also has a number of foundation installation options. The Xtension 110 Double-sided P4 Terminal is a tension based system and is said to be simple and robust. When installed as a driven post system, it also offers a cost-effective solution. The Xtension 110 Double-sided P4 Terminal provides a safe termination for barriers acting as an alternative to conventional double ramped end terminals. Its overall length and low displacement make it particularly suitable for use in restricted sites. The Xtension 110 Double-sided P4 Terminal is tested to EN1317- 4, approved for use on 2309 Highways Agency roads and can be used without a Departure from Standard. Under test, the system proved its capability by redirecting a 1.5tonne vehicle. The impacting vehicle pushes against the impact head smoothly transferring the energy into longitudinal cables which are located behind the system beams. The resistance between the impact head and the cable dissipates the energy during the rearward motion and brings the vehicle to a progressive, controlled halt. The system can be connected directly to W beam barrier systems of N2 containment and W2 working width.

For more information on companies in this article

Related Content

  • Special concrete paver for UK road job
    January 5, 2015
    A specially adapted Wirtgen SP25i concrete slipformer has been used on the M6 motorway near Cannock in the UK. The machine worked together with a Wirtgen ISF25i (independent side feeder) in order to pave a concrete slab under difficult conditions. With an overall length of 373km, the M6 is the longest and one of the most heavily congested motorways in the UK. The M6 connects the M1 motorway near Rugby with Carlisle near the Scottish border. But due to the steadily growing volume of traffic, the Highways
  • Asphalt paving advances available
    June 24, 2024
    Several of the key manufacturers are introducing new developments for the US asphalt paving market with vibration only screeds – Mike Woof writes
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very