Skip to main content

Double sided duty

Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.
February 13, 2012 Read time: 2 mins
Highway Care says its new end treatment system requires fewer parts than existing products, allowing for speedy installation, low repair costs and lower lifetime costs
1529 Highway Care is now offering double-sided P4 terminal that is specially developed for the UK road network. The Xtension 110 Double-sided P4 Terminal is said to be the only approved double-sided P4 terminal available for use in the UK market.

This system is versatile as it can be used for left hand and right hand applications and also has a number of foundation installation options. The Xtension 110 Double-sided P4 Terminal is a tension based system and is said to be simple and robust. When installed as a driven post system, it also offers a cost-effective solution. The Xtension 110 Double-sided P4 Terminal provides a safe termination for barriers acting as an alternative to conventional double ramped end terminals. Its overall length and low displacement make it particularly suitable for use in restricted sites. The Xtension 110 Double-sided P4 Terminal is tested to EN1317- 4, approved for use on 2309 Highways Agency roads and can be used without a Departure from Standard. Under test, the system proved its capability by redirecting a 1.5tonne vehicle. The impacting vehicle pushes against the impact head smoothly transferring the energy into longitudinal cables which are located behind the system beams. The resistance between the impact head and the cable dissipates the energy during the rearward motion and brings the vehicle to a progressive, controlled halt. The system can be connected directly to W beam barrier systems of N2 containment and W2 working width.

For more information on companies in this article

Related Content

  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl