Skip to main content

Counting down

Peter BerghauS is now offering a redesigned countdown system for temporary and mobile traffic lights that is more visible than previous units. The red countdown display for fixed phase traffic light systems has been redesigned with a 185mm high LED display fitted in a weatherproof housing.
February 28, 2012 Read time: 1 min
Using the new countdown system for temporary traffic lights will help boost safety according to supplier Peter Berghaus
300 Peter Berghaus is now offering a redesigned countdown system for temporary and mobile traffic lights that is more visible than previous units. The red countdown display for fixed phase traffic light systems has been redesigned with a 185mm high LED display fitted in a weatherproof housing. The red countdown display is protected by an aluminium housing and features white reflective lettering.

The countdown display can be positioned directly above or next to the red light, so that road users can also see the direct physical reference to the red light. The unit requires a DC supply of 10-15V and is powered by the battery in the mobile traffic light system. Automatic brightness adjustment ensures that the display can be seen clearly.

For more information on companies in this article

Related Content

  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • Illuminated road studs deliver tidal flow safety
    February 14, 2012
    Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.
  • Illuminated road studs deliver tidal flow safety
    May 2, 2012
    Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.
  • New milling and stabilisation technology is coming to market
    May 29, 2013
    An array of new developments in the market for road recycling and stabilisation machines as well as milling equipment is now on offer - Mike Woof reports. Major new developments are being seen in the sector for road recycling and stabilisation equipment, as well as milling machines. New models are coming to market that benefit from the latest low emission engine technology to meet the increasingly tough European and North American requirements.