Skip to main content

Controlled stop with water-filled barrier system

Road traffic accidents are expensive and often frightening, and now most drivers will have encountered an average 80km/hr speed limit on a fast moving road.
February 24, 2012 Read time: 1 min
Road traffic accidents are expensive and often frightening, and now most drivers will have encountered an average 80km/hr speed limit on a fast moving road.

Keeping both lanes of traffic separate is the key to traffic safety, but when a driver loses control of a vehicle, and heads for the other lane of oncoming traffic, there is the potential for a serious accident. Having a barrier system in place that can keep the traffic safely separated reduces the risks for everyone concerned.

3198 Hazard Safety Products says that new BR22 Traffic Separators are now available to BS EN 1317-N1 50mph (80km/hr) test, and are designed to offer maximum safety.

"The range of products is one of the quickest deployable barrier systems on the market, and with up to 200m per load they offer huge savings on labour and transport," says the company.

On impact, the water-filled sections of the RB22 Barrier system will bring an errant vehicle safely to a controlled stop.

For more information on companies in this article

Related Content

  • Bitumen additives raise environmental questions
    February 14, 2012
    New products, including additives, are coming onto the market to help reduce the cost of producing bitumen. Patrick smith reports. According to Eng. Paolo Visconti of Iterchimica, environmental issues and the health and safety of operators of manufacturing plants and workers laying bituminous mixes have raised long debates on the possible harmfulness of fumes which are emitted when heating these mixes at the temperatures (160-180°C) required for their production. "If, on the one hand, the effects on operato
  • Highways: environmental problem or environmental enhancement?
    March 21, 2016
    Highways need not be a blight on the countryside that many people, urban planners included, believe they will always be. By Bram Miller, director, and Martin Broderick, environmental consultant, at Ramboll Environ While the world’s highway networks bring undoubted economic and social benefits, they are generally perceived to lead to negative environmental impacts. Some may consider this an unfair reputation, but it is difficult to argue that in the majority of cases both the construction and operation of
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw