Skip to main content

British Columbia selects Road Zipper for Alex Fraser Bridge

The western Canadian province of British Columbia has signed a deal with Lindsay for deployment of the company’s Road Zipper on the Alex Fraser Bridge The Bridge connects Richmond and New Westminster with North Delta in the Greater Vancouver area. The moveable barrier replaces a static concrete barrier in an attempt to increase traffic flow during peak periods. The Alex Fraser Bridge joins other bridges around the world, such as the Benjamin Franklin Bridge over the Delaware River in the US, that now us
April 4, 2018 Read time: 2 mins
The western Canadian province of British Columbia has signed a deal with 2438 Lindsay for deployment of the company’s Road Zipper on the Alex Fraser Bridge


The Bridge connects Richmond and New Westminster with North Delta in the Greater Vancouver area. The moveable barrier replaces a static concrete barrier in an attempt to increase traffic flow during peak periods.

The Alex Fraser Bridge joins other bridges around the world, such as the Benjamin Franklin Bridge over the Delaware River in the US, that now use a zipper to change lane directions.

Lindsay’s Road Zipper system consists of T-shaped moveable barriers connected to form a continuous wall. Using a conveyor wheel system, the Road Zipper vehicle repositions the barrier system at up to 16kph, creating a moveable ‘zipper lane’.

On the Alex Fraser Bridge, it creates four lanes northbound and three lanes southbound during morning rush hour. At all other times, there will be four lanes southbound and three lanes northbound.

The Alex Fraser Bridge opened in 1986 and was designed to allow for the number of lanes to be increased. At first, only four of the six lanes were used for vehicles. As traffic increased, pedestrian and cycling lanes were moved to the perimeter of the bridge so that all six lanes could be used for vehicles.

British Columbia’s transport department will now re-stripe the lanes, This will add a seventh lane along with the new counter-flow moveable barrier system to improve capacity and help reduce traffic congestion during rush hour.

An average of 119,000 vehicles move across the bridge every day. Officials say motorists could save six minutes on their morning (northbound) commute and up to 16 minutes during the afternoon rush hour (southbound).

“Predicting traffic flow can be difficult – particularly if you’re looking 20 or 30 years into the future. The key to any design is building in as much flexibility as possible from the beginning, so you can efficiently accommodate the needs of a growing population,” said Chris Sanders, senior vice president of Lindsay Transportation Solutions.

Lindsay, based in the US state of Nebraska, said that its revenue from the contract will be around US$14 million.

For more information on companies in this article

Related Content

  • Lindsay and Iteris partner to create smart work zones on US roads
    June 11, 2019
    Lindsay, a manufacturer of infrastructure equipment, and Iteris, a manufacturer of applied informatics for transportation, will together create smart work zones for US roadways. The companies said that their partnership supports the Federal Highway Administration’s (FHWA) Smarter Work Zone campaign to reduce traffic congestion and improve safety in work zones using intelligent transportation systems. There were 799 work zone-related fatalities in the US in 2017 – up 4.5% from their previous three-year aver
  • PPRS: the positive side of structural failures
    March 27, 2018
    You learn from your failures, not your successes. That was the overall message for delegates during the day-two morning session on the impact of engineering structural failures. These lessons are also too often “painful”, said Anne-Marie Leclerq, deputy minister for infrastructure within the ministry of transport for the Canadian province of Quebec. On September 30, 2006, a span of the six-lane Concorde Bridge in Laval, near Montreal, collapsed crushing to death five people and injuring six. Only recently
  • 2010 GRAA Winner Profiles
    February 13, 2012
    Our series of profiles on winning projects from the 2010 Global Road Achievement (GRAA) Awards continues with the Construction Methodology Category won by Barrier Systems/Utah Department of Transportation With any major road construction project, the disruption of traffic flow is of paramount concern for engineers, workers and travellers, particularly as it relates to increased traffic delays and the safety of those driving through the work zone.
  • More on the Newmarket Viaduct replacement
    June 15, 2012
    When it was completed in 1965 – just six years after the Auckland Harbour Bridge – the six-lane Newmarket Viaduct with its tall, slender piers was something of an engineering wonder, the first of its kind in the Southern Hemisphere. Forty years on it had become a much-maligned contributor to Auckland’s chronic traffic congestion, too weak seismically to withstand the heaviest loaded trucks let alone a severe earthquake, so narrow in the shoulders that any accident stopped traffic flow and made it difficult