Skip to main content

British Columbia selects Road Zipper for Alex Fraser Bridge

The western Canadian province of British Columbia has signed a deal with Lindsay for deployment of the company’s Road Zipper on the Alex Fraser Bridge The Bridge connects Richmond and New Westminster with North Delta in the Greater Vancouver area. The moveable barrier replaces a static concrete barrier in an attempt to increase traffic flow during peak periods. The Alex Fraser Bridge joins other bridges around the world, such as the Benjamin Franklin Bridge over the Delaware River in the US, that now us
April 4, 2018 Read time: 2 mins
The western Canadian province of British Columbia has signed a deal with 2438 Lindsay for deployment of the company’s Road Zipper on the Alex Fraser Bridge


The Bridge connects Richmond and New Westminster with North Delta in the Greater Vancouver area. The moveable barrier replaces a static concrete barrier in an attempt to increase traffic flow during peak periods.

The Alex Fraser Bridge joins other bridges around the world, such as the Benjamin Franklin Bridge over the Delaware River in the US, that now use a zipper to change lane directions.

Lindsay’s Road Zipper system consists of T-shaped moveable barriers connected to form a continuous wall. Using a conveyor wheel system, the Road Zipper vehicle repositions the barrier system at up to 16kph, creating a moveable ‘zipper lane’.

On the Alex Fraser Bridge, it creates four lanes northbound and three lanes southbound during morning rush hour. At all other times, there will be four lanes southbound and three lanes northbound.

The Alex Fraser Bridge opened in 1986 and was designed to allow for the number of lanes to be increased. At first, only four of the six lanes were used for vehicles. As traffic increased, pedestrian and cycling lanes were moved to the perimeter of the bridge so that all six lanes could be used for vehicles.

British Columbia’s transport department will now re-stripe the lanes, This will add a seventh lane along with the new counter-flow moveable barrier system to improve capacity and help reduce traffic congestion during rush hour.

An average of 119,000 vehicles move across the bridge every day. Officials say motorists could save six minutes on their morning (northbound) commute and up to 16 minutes during the afternoon rush hour (southbound).

“Predicting traffic flow can be difficult – particularly if you’re looking 20 or 30 years into the future. The key to any design is building in as much flexibility as possible from the beginning, so you can efficiently accommodate the needs of a growing population,” said Chris Sanders, senior vice president of Lindsay Transportation Solutions.

Lindsay, based in the US state of Nebraska, said that its revenue from the contract will be around US$14 million.

For more information on companies in this article

Related Content

  • Virginia project for Parsons
    June 28, 2016
    Parsons has won a deal to design and installation of the nation’s first all-lane, dynamic-priced tolling system on a 16km segment of Interstate 66 in Virginia. This stretch of highway runs from Interstate 495, the Capital Beltway, to US Route 29 in Rosslyn, Virginia. Dynamic tolling, able to adjust toll pricing to demand, will operate in the peak travel direction during weekday rush hours. This will help lower traffic congestion into and out of US capital Washington, DC.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Lindsay installs first TAU-XR Xpress cushion
    June 27, 2024
    The installation of the TAU-Xpress repair crash cushion was in Las Vegas, Nevada, at the intersection of Highway 91 and Great Basin.