Skip to main content

The Blade is cutting edge in truck mounted attenuator technology

The Blade truck-mounted attenuator from the Verdegro Group has met the highest safety level - Manual for Assessing Safety Hardware. The AASHTO Manual for Assessing Safety Hardware (MASH) is the new set of regulations for crash-testing of safety hardware devices that are destined for use on the US National Highway System. It updates and replaces the 20-year old NCHRP Report 350. Verdegro also said that the Blade TMA was also nominated for the 2017 ATSSA innovation award, which took place just after World Hig
April 18, 2017 Read time: 2 mins
The Blade stands up to MASH safety standards
The Blade truck-mounted attenuator from the Verdegro Group has met the highest safety level - Manual for Assessing Safety Hardware. The AASHTO Manual for Assessing Safety Hardware (MASH) is the new set of regulations for crash-testing of safety hardware devices that are destined for use on the US National Highway System. It updates and replaces the 20-year old NCHRP Report 350.


8617 Verdegro also said that the Blade TMA was also nominated for the 2017 ATSSA innovation award, which took place just after 3260 World Highways went to press. The 2466 American Traffic Safety Services Association represents the road safety, traffic safety and highway safety industry in the US through legislative advocacy, traffic control safety training and member partnerships.

The MASH safety changes are mainly necessitated by alterations made to vehicles over the past decade. Cars have greatly increased in size, so updated regulations are required to keep occupants safe. For example, the average bumper height on light trucks has risen considerably since 1993, so previous highway safety designs are inadequate.

The new MASH standard sets stricter criteria for truck-mounted attenuators. Bigger and heavier and newer test vehicles must be used during testing. Upper and lower truck weight has to be tested, ballast has to be fixed, and also the arrow board together with the TMA construction must have to be tested. Additionally, offset and offset angel tests are now required in MASH.

This patented BLADE TMA has been full-scale crash-tested according to MASH 2009/2016 at the 2347 Texas Transportation Institute facility. All the ride-down values were within the preferred values.

Verdegro, based in Munnikenheiweg, the Netherlands, said the BLADE TMA will be available for the US market from April.

Related Content

  • CONEXPO-CON/AGG expected to hit record in 2017, create new pavilion
    April 19, 2016
    As bauma winds down, CONEXPO-CON/AGG is heating up. Officials of the Association of Equipment Manufacturers and other CONEXPO-CON/AGG organisers on Thursday offered a brief preview of what to expect in Las Vegas in 2017. The show will be bigger than ever, with a 450,000m2 footprint, said Rich Goldsbury, AEM board member and the president of Bobcat North America and Oceania. “It will be our largest show ever,” said Goldsbury, who spoke during a press conference at bauma. AEM is continually focuse
  • Cifa equipment is pressed into service for Venice’s Mose project
    November 26, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance.
  • Innovative testing boosts pavement quality
    February 16, 2012
    Innovative materials testing technology will allow the road sector to boost pavement quality, Mike Woof and Patrick Smith report. With billions being spent on highway construction worldwide, governments are looking to make sure their investments last as long as possible.
  • Powered two wheeler safety plan for Europe
    November 16, 2015
    A new road safety strategy for powered two wheelers in Europe has been set out jointly following discussions. The results of analysis have been set out in a joint position statement by the bodies FEMA, FIM and FIM Europe. In the draft report FEMA and FIM have identified seven major areas of great importance that are in accordance with the positions of the riders’ organisations in Europe and elsewhere. Key recommendations and statements from the OECD-ITF draft report highlight issues for the safety of powe