Skip to main content

Berghaus ProTec-Tor 120 successfully tested to DIN EN 1317, T3

German manufacturer Berghaus reports that its emergency opening ProTec-Tor 120 has successfully been tested according to the test criteria and requirements of DIN EN 1317. Test took place with a truck (TB 41) travelling at 70km/h and a car (TB 21) travelling at 80km/h. The ProTec-Tor 120 is a special element in our crash barrier system ProTec 100 (T3 / W2), according to the acceptance criteria of containment level T3. Up to now, in Germany such special elements were usually corroborated in static s
July 1, 2019 Read time: 2 mins
Berghaus ProTec-Tor 120: quickly and easily separated to create an opening
German manufacturer Berghaus reports that its emergency opening ProTec-Tor 120 has successfully been tested according to the test criteria and requirements of DIN EN 1317.


Test took place with a truck (TB 41) travelling at 70km/h and a car (TB 21) travelling at 80km/h.

The ProTec-Tor 120 is a special element in our crash barrier system ProTec 100 (T3 / W2), according to the acceptance criteria of containment level T3.

Up to now, in Germany such special elements were usually corroborated in static situations and as a computed simulation. But simulations are not always suitable for providing indubitable corroboration, particularly in terms of the dynamic forces and their impacts on special elements.

Because emergency openings are meanwhile increasingly required as safety devices in restraint systems with contraflow traffic, Berghaus instructed an accredited test lab to test the Pro-Tec-Tor 120.

In the standard crash test, the longitudinal force transfers and the functionality of the special element and also of the connected crash barrier system were documented on the basis of the two impact tests that were carried out. The emergency opening functioned perfectly even after the crash tests with a truck and car at high speeds with slight shifting of the system.

The ProTec-Tor 120 – as well as the ProTec-Tor 50 - are easily separated elements for mobile crash barriers that can be opened quickly in an emergency without needing tools. According to the company, only a couple of simple actions are needed to release the force-fit connection of the crash barriers to create an opening.

Related Content

  • Mexico introduces new professional roles to address road safety
    June 24, 2013
    *Ana Maria de la Parra introduces the new external road operation supervisors and fatal accident appraisers who could make a vital contribution to improving the efficiency and safety of highways in middle-income countries like Mexico. Sometimes it is difficult to pin down the perception of a country like Mexico in the popular international mindset. Visitors travelling to Mexico City for the first time are often amazed by its size. They are also frequently taken aback by how unexpectedly advanced it is in te
  • REBLOC barriers for Antwerp’s Oosterweel Link
    October 31, 2022
    Effective noise protection is an essential part of road infrastructure- both temporarily during construction and permanently along the finished road.
  • BOMAG: road construction with warm mix asphalt
    July 3, 2024
    When it comes to paving and compacting warm mix asphalt (WMA), BOMAG rollers and pavers really come into their own. Well prepared for what’s to come: road construction with warm mix asphalt.
  • Efficient asset management to trim maintenance budgets
    January 22, 2014
    Transport infrastructure is taken for granted in many, if not most, developed countries. This has resulted in a shortage of investment in maintenance, posing potential long term cost issues. In many developing nations transport networks are expanding fast, but insufficient thought is also being given to how these will be maintained.