Skip to main content

Berghaus ProTec-Tor 120 successfully tested to DIN EN 1317, T3

German manufacturer Berghaus reports that its emergency opening ProTec-Tor 120 has successfully been tested according to the test criteria and requirements of DIN EN 1317. Test took place with a truck (TB 41) travelling at 70km/h and a car (TB 21) travelling at 80km/h. The ProTec-Tor 120 is a special element in our crash barrier system ProTec 100 (T3 / W2), according to the acceptance criteria of containment level T3. Up to now, in Germany such special elements were usually corroborated in static s
July 1, 2019 Read time: 2 mins
Berghaus ProTec-Tor 120: quickly and easily separated to create an opening
German manufacturer Berghaus reports that its emergency opening ProTec-Tor 120 has successfully been tested according to the test criteria and requirements of DIN EN 1317.


Test took place with a truck (TB 41) travelling at 70km/h and a car (TB 21) travelling at 80km/h.

The ProTec-Tor 120 is a special element in our crash barrier system ProTec 100 (T3 / W2), according to the acceptance criteria of containment level T3.

Up to now, in Germany such special elements were usually corroborated in static situations and as a computed simulation. But simulations are not always suitable for providing indubitable corroboration, particularly in terms of the dynamic forces and their impacts on special elements.

Because emergency openings are meanwhile increasingly required as safety devices in restraint systems with contraflow traffic, Berghaus instructed an accredited test lab to test the Pro-Tec-Tor 120.

In the standard crash test, the longitudinal force transfers and the functionality of the special element and also of the connected crash barrier system were documented on the basis of the two impact tests that were carried out. The emergency opening functioned perfectly even after the crash tests with a truck and car at high speeds with slight shifting of the system.

The ProTec-Tor 120 – as well as the ProTec-Tor 50 - are easily separated elements for mobile crash barriers that can be opened quickly in an emergency without needing tools. According to the company, only a couple of simple actions are needed to release the force-fit connection of the crash barriers to create an opening.

Related Content

  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Solar security with SOSEC barriers from Green Gate Access Systems
    December 7, 2017
    SOSEC, a mobile solar-powered barrier system for work sites, made its UK debut on the M23 motorway. The SOSEC gate – solar and security – is made by Green Gate Access Systems, a subsidiary of Solar Gates UK, which provides and installs solar and mains-powered gates, barriers and access control systems. The system on the M23 provided contractors with a power-free method to slow and control access to the work zone, track who is on site and prevent accidental entry from the public.
  • Concrete mixing technology offers advanced recipes
    February 13, 2012
    Modern concrete production plants are using technology to offer more sophisticated mix recipes as Patrick Smith reports. The growing trend towards ever more sophisticated concrete recipes calls for fully developed mixing technology. Companies are responding to the challenges with equipment that offers new levels of sophistication including computer controls and units that can deliver a huge variety of mix recipes.
  • Shhhh, keeping roads quiet
    September 1, 2022
    Effective noise protection is an essential part of road infrastructure- both temporarily during construction and permanently along the finished road.