Skip to main content

BarrierGuard 800 keeps key U.S. bridge open

BarrierGuard 800 from Highway Care is said to be preventing the closure of a vital highway bridge in the United States. As a critical part of the US national infrastructure, the Sarah Mildred Long Bridge services the Portsmouth Naval Shipyard. The link allows the transporting of spent nuclear fuel and heavy freight bound to and from the naval shipyard, with an average of 15,000 vehicles per day crossing this structurally deficient bridge. The railing along the Sarah Mildred Long Bridge had begun to deterio
April 11, 2013 Read time: 3 mins
BarrierGuard 800 from 1529 Highway Care is said to be preventing the closure of a vital highway bridge in the United States.

As a critical part of the US national infrastructure, the Sarah Mildred Long Bridge services the Portsmouth Naval Shipyard. The link allows the transporting of spent nuclear fuel and heavy freight bound to and from the naval shipyard, with an average of 15,000 vehicles per day crossing this structurally deficient bridge.

The railing along the Sarah Mildred Long Bridge had begun to deteriorate, rusted through due to age and exposure. Recently the Memorial Bridge had been closed and the area could not survive without two bridges servicing the population. It left the Maine and New Hampshire Departments of Transportation in need of an immediate fix to keep this bridge from being closed.

After a careful study and much discussion, the decision was made to place the new innovative lightweight steel barrier across the Sarah Long Bridge to keep it open while a new bridge could be built. The Maine DOT and HNTB sent out a proposal which called for a steel barrier to be installed in less than 30 days after the project award. The bridge was already listed as structurally deficient so weight and speed of installation was an issue. Another concern was the concrete bridge deck being in such bad shape that the anchoring pattern would need to be shallow, as a through deck anchor was not viable.

The contract was awarded to CPM Constructors of Yarmouth, Maine who has completed over one hundred bridge and bridge rehabilitation projects. CPM Constructors is a recipient of the 2011 Build Maine Award and prestigious Build America Merit Award. To accomplish this task in a cost-effective and timely manner, CPM chose BarrierGuard 800 steel barrier manufactured by Highway Care in the U.S.

BarrierGuard 800 is said to weigh only 27.21kg per foot, appropriate for the reduced load limits of this structurally deficient bridge. Its narrow 53.34cm footprint is said to allow maximum travel lane usage for bridge traffic.  The option of internal anchoring to prevent snow plow snagging, along with a 12.7cm anchor embedment depth, were also said to be attractive features of the barrier.  Galvanized to ASTM 123 standards with a life cycle of approximately 20 years, the BarrierGuard 800 installation is expected to outlast the bridge.

An additional challenge for CPM Constructors has been limited 10pm-5am working hours to accommodate the traffic flow requirements of Naval base personnel. The ability to install up to 304.8m of BarrierGuard 800 per hour helped to deliver the 1,646m barrier installation complete, on budget and on time.

For more information on companies in this article

Related Content

  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.