Skip to main content

BarrierGuard 800 keeps key U.S. bridge open

BarrierGuard 800 from Highway Care is said to be preventing the closure of a vital highway bridge in the United States. As a critical part of the US national infrastructure, the Sarah Mildred Long Bridge services the Portsmouth Naval Shipyard. The link allows the transporting of spent nuclear fuel and heavy freight bound to and from the naval shipyard, with an average of 15,000 vehicles per day crossing this structurally deficient bridge. The railing along the Sarah Mildred Long Bridge had begun to deterio
April 11, 2013 Read time: 3 mins
BarrierGuard 800 from 1529 Highway Care is said to be preventing the closure of a vital highway bridge in the United States.

As a critical part of the US national infrastructure, the Sarah Mildred Long Bridge services the Portsmouth Naval Shipyard. The link allows the transporting of spent nuclear fuel and heavy freight bound to and from the naval shipyard, with an average of 15,000 vehicles per day crossing this structurally deficient bridge.

The railing along the Sarah Mildred Long Bridge had begun to deteriorate, rusted through due to age and exposure. Recently the Memorial Bridge had been closed and the area could not survive without two bridges servicing the population. It left the Maine and New Hampshire Departments of Transportation in need of an immediate fix to keep this bridge from being closed.

After a careful study and much discussion, the decision was made to place the new innovative lightweight steel barrier across the Sarah Long Bridge to keep it open while a new bridge could be built. The Maine DOT and HNTB sent out a proposal which called for a steel barrier to be installed in less than 30 days after the project award. The bridge was already listed as structurally deficient so weight and speed of installation was an issue. Another concern was the concrete bridge deck being in such bad shape that the anchoring pattern would need to be shallow, as a through deck anchor was not viable.

The contract was awarded to CPM Constructors of Yarmouth, Maine who has completed over one hundred bridge and bridge rehabilitation projects. CPM Constructors is a recipient of the 2011 Build Maine Award and prestigious Build America Merit Award. To accomplish this task in a cost-effective and timely manner, CPM chose BarrierGuard 800 steel barrier manufactured by Highway Care in the U.S.

BarrierGuard 800 is said to weigh only 27.21kg per foot, appropriate for the reduced load limits of this structurally deficient bridge. Its narrow 53.34cm footprint is said to allow maximum travel lane usage for bridge traffic.  The option of internal anchoring to prevent snow plow snagging, along with a 12.7cm anchor embedment depth, were also said to be attractive features of the barrier.  Galvanized to ASTM 123 standards with a life cycle of approximately 20 years, the BarrierGuard 800 installation is expected to outlast the bridge.

An additional challenge for CPM Constructors has been limited 10pm-5am working hours to accommodate the traffic flow requirements of Naval base personnel. The ability to install up to 304.8m of BarrierGuard 800 per hour helped to deliver the 1,646m barrier installation complete, on budget and on time.

For more information on companies in this article

Related Content

  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Workzone safety protects workforce and drivers
    May 3, 2012
    Highway construction work zones are dangerous places, and anything that can improve safety is welcomed as Patrick Smith reports. The safe and efficient flow of traffic through work zones is a major concern to transportation officials, industry, the public, businesses, and commercial motor carriers. This is the view of the US Federal Highway Administration (FHWA), which has developed the Highway Work Zone Safety Program to reduce the fatalities and injurious crashes in work zones, and to enhance traffic oper
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl