Skip to main content

ACO’s Qmax Neo drainage for Costa Rica

Stormwater drainage by ACO is keeping dry some access roads for National Route 1, the Carretera Interamericana Norte (North Interamerican Road).
June 16, 2021 Read time: 2 mins
Effective drainage can be achieved using preformed sections that are set in concrete: all images courtesy of © ACO

The route is important and is the northern segment of the Pan-American Highway, which crosses Costa Rica and connects the Central American nations. The route runs through the casco central districts of capital San Jose, linking the city centre with San Jose International, Airport Tobias Bolanos.

In all 2,900m of the ACO Qmax Neo product have been installed on 10 access roads. The ACO Qmax Neo product has been installed on the inside curve to prevent flooding and vehicles aquaplaning during the seasonal four month period of heavy rainfall. The opposite road section drains into an open pitch. The F900 grating was chosen because the design meets the required intake area and the design can be integrated into road surface.

Contractor Pedregal Constructora installed the new Qmax 300 Neo products using concrete to form the structural support around the pre-formed units. The pavement beam feature allowed the positioning of reinforcement and also assisted the flow of concrete through the top part of the product during installation. This job was made easier through the use of an installation jig, which held the product in place.

The sections are placed in excavations, with concrete then being poured around
The sections are placed in excavations, with concrete then being poured around

The ACO DRAIN Qmax Neo is a new member of the ACO Qmax family which now includes the range of sizes of 150mm, 225mm, 300mm, 350mm up to the egg-shaped 550mm, 700mm and 900mm units. The larger sizes offer a substantial retetention volume and collected rainwater can be stored temporarily and then discharged into the sewers system in a controlled manner during heavy rainfall events.

Intergrated gaskets make the channel watertight in accordance with EN 1433. All sizes can be used with tailormade inlet shafts and inspection elements to suit the requirements of the project. For road sections without a camber, this can be delivered using special height adapters to achieve a slope within each channel section.

For more information please email [email protected]

Sponsored content produced in association with ACO Surface Water Management

For more information on companies in this article

Related Content

  • Asphalt plant retrofit with Benninghoven
    March 30, 2022
    An existing asphalt mixing plant in Braunfels, Germany has benefited from a retrofit solution to boost its performance. Asphalt plant manufacturer Benninghoven was able to supply a new mixing tower and drying section to upgrade the performance of the facility.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Digital transformation with production system solutions from Wirtgen Group
    May 24, 2024

    Maximising a machine’s uptime, allocation of resources the most efficient way, completing projects on schedule and ensuring the quality of results are nowadays major factors that decide whether a company can run its business successfully or not. This is amplified by the fact that the labor-intensive construction sector is affected by a global shortage of skilled workforce like few other industries and has to meet far-reaching requirements for quality, documentation, and sustainability.

  • Upgrade due for Nicaragua’s NIC 3 highway
    September 11, 2013
    Nicaragua’s Ministry of Transportation and Infrastructure has awarded the first of a series of contracts to upgrade the NIC 3 highway. The construction work will be carried out by a consortium comprising contractors Constructora Meco, CEMEX and Llansa Ingenieros. This first phase will be for a 34.4km section of the route while the second stretch will be 15.6km long. In all the work is expected to take 18 months to complete and is likely to cost around US$40 million. Financing is being provided by the Fund o