Skip to main content

ACO’s Qmax Neo drainage for Costa Rica

Stormwater drainage by ACO is keeping dry some access roads for National Route 1, the Carretera Interamericana Norte (North Interamerican Road).
June 16, 2021 Read time: 2 mins
Effective drainage can be achieved using preformed sections that are set in concrete: all images courtesy of © ACO

The route is important and is the northern segment of the Pan-American Highway, which crosses Costa Rica and connects the Central American nations. The route runs through the casco central districts of capital San Jose, linking the city centre with San Jose International, Airport Tobias Bolanos.

In all 2,900m of the ACO Qmax Neo product have been installed on 10 access roads. The ACO Qmax Neo product has been installed on the inside curve to prevent flooding and vehicles aquaplaning during the seasonal four month period of heavy rainfall. The opposite road section drains into an open pitch. The F900 grating was chosen because the design meets the required intake area and the design can be integrated into road surface.

Contractor Pedregal Constructora installed the new Qmax 300 Neo products using concrete to form the structural support around the pre-formed units. The pavement beam feature allowed the positioning of reinforcement and also assisted the flow of concrete through the top part of the product during installation. This job was made easier through the use of an installation jig, which held the product in place.

The sections are placed in excavations, with concrete then being poured around
The sections are placed in excavations, with concrete then being poured around

The ACO DRAIN Qmax Neo is a new member of the ACO Qmax family which now includes the range of sizes of 150mm, 225mm, 300mm, 350mm up to the egg-shaped 550mm, 700mm and 900mm units. The larger sizes offer a substantial retetention volume and collected rainwater can be stored temporarily and then discharged into the sewers system in a controlled manner during heavy rainfall events.

Intergrated gaskets make the channel watertight in accordance with EN 1433. All sizes can be used with tailormade inlet shafts and inspection elements to suit the requirements of the project. For road sections without a camber, this can be delivered using special height adapters to achieve a slope within each channel section.

For more information please email [email protected]

Sponsored content produced in association with ACO Surface Water Management

For more information on companies in this article

Related Content

  • Advanced road recycling with Wirtgen
    November 4, 2019
    Wirtgen has developed its high-performance W 380 CRi cold recycler to meet requirements for roads requiring structural rehabilitation. This innovative machine is said to highly productive, allowing it to carry out structural road rehabilitation more quickly and with greater cost-effectiveness and quality than previous equipment.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Successfully manage inventory when you have multiple crushers on site
    June 11, 2021
    Optimised maintenance is a key competitive advantage for an aggregate producer