Skip to main content

ACO’s Qmax Neo drainage for Costa Rica

Stormwater drainage by ACO is keeping dry some access roads for National Route 1, the Carretera Interamericana Norte (North Interamerican Road).
June 16, 2021 Read time: 2 mins
Effective drainage can be achieved using preformed sections that are set in concrete: all images courtesy of © ACO

The route is important and is the northern segment of the Pan-American Highway, which crosses Costa Rica and connects the Central American nations. The route runs through the casco central districts of capital San Jose, linking the city centre with San Jose International, Airport Tobias Bolanos.

In all 2,900m of the ACO Qmax Neo product have been installed on 10 access roads. The ACO Qmax Neo product has been installed on the inside curve to prevent flooding and vehicles aquaplaning during the seasonal four month period of heavy rainfall. The opposite road section drains into an open pitch. The F900 grating was chosen because the design meets the required intake area and the design can be integrated into road surface.

Contractor Pedregal Constructora installed the new Qmax 300 Neo products using concrete to form the structural support around the pre-formed units. The pavement beam feature allowed the positioning of reinforcement and also assisted the flow of concrete through the top part of the product during installation. This job was made easier through the use of an installation jig, which held the product in place.

The sections are placed in excavations, with concrete then being poured around
The sections are placed in excavations, with concrete then being poured around

The ACO DRAIN Qmax Neo is a new member of the ACO Qmax family which now includes the range of sizes of 150mm, 225mm, 300mm, 350mm up to the egg-shaped 550mm, 700mm and 900mm units. The larger sizes offer a substantial retetention volume and collected rainwater can be stored temporarily and then discharged into the sewers system in a controlled manner during heavy rainfall events.

Intergrated gaskets make the channel watertight in accordance with EN 1433. All sizes can be used with tailormade inlet shafts and inspection elements to suit the requirements of the project. For road sections without a camber, this can be delivered using special height adapters to achieve a slope within each channel section.

For more information please email [email protected]

Sponsored content produced in association with ACO Surface Water Management

For more information on companies in this article

Related Content

  • Costa Rica bridge connection underway
    November 26, 2020
    Construction is underway for a key Costa Rica bridge connection.
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Costa Rica: Conavi gets more time and funds for road maintenance
    October 26, 2015
    Costa Rica’s road agency Conavi has extended the deadline and increase funds by $154 million for road repair and maintenance contracts. Contracts will be extended for the companies involved which include Constructora Meco, Grupo Orosi, Quebradores del Sur, Constructora Hernan Solis and Conansa. The Treasury Inspector's Office made the announcement, according to El Pais newspaper. Meanwhile, four banks are considering an investment in the 60km San Jose-San Ramon Road Expansion Project. They include