Skip to main content

ACO’s Qmax Neo drainage for Costa Rica

Stormwater drainage by ACO is keeping dry some access roads for National Route 1, the Carretera Interamericana Norte (North Interamerican Road).
June 16, 2021 Read time: 2 mins
Effective drainage can be achieved using preformed sections that are set in concrete: all images courtesy of © ACO

The route is important and is the northern segment of the Pan-American Highway, which crosses Costa Rica and connects the Central American nations. The route runs through the casco central districts of capital San Jose, linking the city centre with San Jose International, Airport Tobias Bolanos.

In all 2,900m of the ACO Qmax Neo product have been installed on 10 access roads. The ACO Qmax Neo product has been installed on the inside curve to prevent flooding and vehicles aquaplaning during the seasonal four month period of heavy rainfall. The opposite road section drains into an open pitch. The F900 grating was chosen because the design meets the required intake area and the design can be integrated into road surface.

Contractor Pedregal Constructora installed the new Qmax 300 Neo products using concrete to form the structural support around the pre-formed units. The pavement beam feature allowed the positioning of reinforcement and also assisted the flow of concrete through the top part of the product during installation. This job was made easier through the use of an installation jig, which held the product in place.

The sections are placed in excavations, with concrete then being poured around
The sections are placed in excavations, with concrete then being poured around

The ACO DRAIN Qmax Neo is a new member of the ACO Qmax family which now includes the range of sizes of 150mm, 225mm, 300mm, 350mm up to the egg-shaped 550mm, 700mm and 900mm units. The larger sizes offer a substantial retetention volume and collected rainwater can be stored temporarily and then discharged into the sewers system in a controlled manner during heavy rainfall events.

Intergrated gaskets make the channel watertight in accordance with EN 1433. All sizes can be used with tailormade inlet shafts and inspection elements to suit the requirements of the project. For road sections without a camber, this can be delivered using special height adapters to achieve a slope within each channel section.

For more information please email [email protected]

Sponsored content produced in association with ACO Surface Water Management

For more information on companies in this article

Related Content

  • Light, CAMS, action on premium asphalt recycling
    July 10, 2023
    CAMS had a sizeable presence at the recent SaMoTer-Asphaltica co-located exhibitions (3-7 May 2023), with the on-show Centauro XL 150.69 APR, an unmissable Italian market introduction to the new Centauro XL 150 APR series machines.
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Simex: Road Maintenance
    October 26, 2023
    In the world of road maintenance and paving, as well as construction, the issue of recovering material deriving from demolition and scarification is becoming increasingly urgent, with the dual objective of combining environmental protection with economic savings. Those who work in the sector are well aware of the huge costs of transporting and disposing of asphalt and material from demolition, as well as the costs for the purchase and transport of new raw materials to the site. Now, as never before, the sector features its own circular economy, particularly in regards to bituminous conglomerates: road paving can be recycled several times, in full compliance with the regulations in force.
  • Road widening project to go ahead in Costa Rica
    November 2, 2018
    An important road widening project is to go ahead in Costa Rica, part of a wider plan to upgrade the important Highway 1 route between Canas and Barranca. This contract will see the improvement of the 25km road connecting San Gerardo de Chomes and Barrancas, with work due to start in early 2019. The project is costing US$103.4 million and the package of works was awarded to the Chinese contractor, Power Construction Corporation of China. The contract is one of three to upgrade the 70km stretch of the import