Skip to main content

VIDEO: Switzerland’s Astra Bridge concept to be tendered

Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept. The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency. The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is
May 23, 2019 Read time: 3 mins

Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept.

The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency.

The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is positioned directly above where road crews are working. The effect is to create a “bridge” along the length of the lane below upon which paving or maintenance is underway.

The call for tenders will encompass the following services: engineering, production, surveying and control concept, assembly and dismantling concept and finally the operating concept.
 
In order to repair and maintain the heavily frequented motorways in metropolitan regions, work has to be carried out at night to an ever-increasing extent. The required closures of traffic lanes increasingly give rise to congestion, even during the night. To prevent this, intervention times are periodically revised and frequently must be reduced to the detriment of roadwork projects.

The time slots for the implementation of roadworks permit only short construction phases and are also a risk factor in terms of quality and worker safety. In addition, the installation and removal of the temporary safety barriers that are required for night-time work costs valuable time and money, notes FEDRO.

FEDRO said it has carried out a feasibility study concerning a specially designed mobile ramp that accommodates two lanes of traffic.

A roadwork site with a width of 5.2m and a length of 100m can be set up beneath the ramp which can be raised hydraulically. The ramp can also be moved both longitudinally and laterally.

Moving the ramp system over a distance of 100m should take between 10-20 minutes, says the agency. It must be possible to assemble the drive-on and drive-off sections in the course of one night. The remainder of the ramp can be extended during a second night to a length of 238m.

To avoid indentations in the road surface, the loads can be borne by large insulated base plates.

FEDRO says it wants the system to be operational by 2022.

The e-mail address for companies interested in submitting a bid is: %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-email [email protected] false mailto:[email protected] true false%>

Astra’s vital statistics

Number of traffic lanes: 2
Length: 238m, but extendable using modular sections
Width: 7.3m
Maximum incline (drive-on/drive-off sections): 6.1%
Clearance in travel direction: 5.2m x 3.1m
Lateral clearance: 2.2m x 3.1m
Weight: around 1,200tonnes
Moving speed: around 0.5kph


Related Content

  • Improving conspicuity and safety for India’s cyclists
    March 13, 2014
    IRF’s India Chapter launches major drive to promote the conspicuity of cyclists Road accident deaths in India are among the highest in the world. Cyclists constitute a particularly vulnerable category of road users with more than 6,800 estimated to have lost their lives on the country’s roads in 2011 alone. A large proportion of the fatalities can be attributed to nothing more than the fact that cyclists are not always sufficiently conspicuous to other road users. To address this tragic state of aff
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
  • Video: Motorcyclist rescues kitten from busy intersection
    November 26, 2015
    A heart-stopping moment when a motorcyclist stopped at a busy intersection see what she thought was a leaf blowing around on the road, but was actually a tiny kitten. Click here to watch as her helmet cam records the event, including first sight of the little thing on the asphalt where the animal was only a meter or so away from traffic rushing through the intersection. A pickup just brushes by the furry ball only seconds before the motorcyclist was able to put the bike on its side stand, warn traffic awa
  • California redefines the term carpool
    April 14, 2015
    California is home to many weird and wonderful home-made vehicles, some more useful than other. But few can be as useful as the car pool table car which can do up to 160kph on the freeway. As shown by this – complete with all the double entendres you could wish for – the owner can drive to the beach, park up and proceed to play pool, which apparently attracts a lot of beach bunnies. http://www.msn.com/en-gb/video/watch/video/vi-AAaCRoj?ocid=OutNUK&from=OutNUK&FORM=BWVOLC A late model Chevrolet Mont