Skip to main content

VIDEO: Switzerland’s Astra Bridge concept to be tendered

Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept. The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency. The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is
May 23, 2019 Read time: 3 mins

Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept.

The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency.

The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is positioned directly above where road crews are working. The effect is to create a “bridge” along the length of the lane below upon which paving or maintenance is underway.

The call for tenders will encompass the following services: engineering, production, surveying and control concept, assembly and dismantling concept and finally the operating concept.
 
In order to repair and maintain the heavily frequented motorways in metropolitan regions, work has to be carried out at night to an ever-increasing extent. The required closures of traffic lanes increasingly give rise to congestion, even during the night. To prevent this, intervention times are periodically revised and frequently must be reduced to the detriment of roadwork projects.

The time slots for the implementation of roadworks permit only short construction phases and are also a risk factor in terms of quality and worker safety. In addition, the installation and removal of the temporary safety barriers that are required for night-time work costs valuable time and money, notes FEDRO.

FEDRO said it has carried out a feasibility study concerning a specially designed mobile ramp that accommodates two lanes of traffic.

A roadwork site with a width of 5.2m and a length of 100m can be set up beneath the ramp which can be raised hydraulically. The ramp can also be moved both longitudinally and laterally.

Moving the ramp system over a distance of 100m should take between 10-20 minutes, says the agency. It must be possible to assemble the drive-on and drive-off sections in the course of one night. The remainder of the ramp can be extended during a second night to a length of 238m.

To avoid indentations in the road surface, the loads can be borne by large insulated base plates.

FEDRO says it wants the system to be operational by 2022.

The e-mail address for companies interested in submitting a bid is: %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-email [email protected] false mailto:[email protected] true false%>

Astra’s vital statistics

Number of traffic lanes: 2
Length: 238m, but extendable using modular sections
Width: 7.3m
Maximum incline (drive-on/drive-off sections): 6.1%
Clearance in travel direction: 5.2m x 3.1m
Lateral clearance: 2.2m x 3.1m
Weight: around 1,200tonnes
Moving speed: around 0.5kph


Related Content

  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • VIDEO: London’s Silvertown Tunnel gets approval
    October 13, 2016
    A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

    The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

    London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.
  • Sandvik Construction’s new CH550 cone crusher
    January 6, 2017
    Sandvik Construction says its new generation of compact cone crusher provides customers with optimum performance and good cubical shape, while ensuring low operating costs per tonne for a wide range of materials and applications. The all-new patented 18.9tonne Sandvik CH550, is based on the proven HYDROCONE design, with the CH550 combining the ability to produce excellent shaped products, in fewer crushing stages.”