Skip to main content

VIDEO: Switzerland’s Astra Bridge concept to be tendered

Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept. The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency. The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is
May 23, 2019 Read time: 3 mins

Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from road crews – the Astra Bridge concept.

The federal highways agency - FEDRO - will be asking general contractors to submit bids starting this summer for the Astra Bridge system, according to the agency.

The system, to be used on motorways, includes ramp sections at each end of what amounts to a train of elevated connected road sections. Vehicles run onto the top of the train which is positioned directly above where road crews are working. The effect is to create a “bridge” along the length of the lane below upon which paving or maintenance is underway.

The call for tenders will encompass the following services: engineering, production, surveying and control concept, assembly and dismantling concept and finally the operating concept.
 
In order to repair and maintain the heavily frequented motorways in metropolitan regions, work has to be carried out at night to an ever-increasing extent. The required closures of traffic lanes increasingly give rise to congestion, even during the night. To prevent this, intervention times are periodically revised and frequently must be reduced to the detriment of roadwork projects.

The time slots for the implementation of roadworks permit only short construction phases and are also a risk factor in terms of quality and worker safety. In addition, the installation and removal of the temporary safety barriers that are required for night-time work costs valuable time and money, notes FEDRO.

FEDRO said it has carried out a feasibility study concerning a specially designed mobile ramp that accommodates two lanes of traffic.

A roadwork site with a width of 5.2m and a length of 100m can be set up beneath the ramp which can be raised hydraulically. The ramp can also be moved both longitudinally and laterally.

Moving the ramp system over a distance of 100m should take between 10-20 minutes, says the agency. It must be possible to assemble the drive-on and drive-off sections in the course of one night. The remainder of the ramp can be extended during a second night to a length of 238m.

To avoid indentations in the road surface, the loads can be borne by large insulated base plates.

FEDRO says it wants the system to be operational by 2022.

The e-mail address for companies interested in submitting a bid is: %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-email [email protected] false mailto:[email protected] true false%>

Astra’s vital statistics

Number of traffic lanes: 2
Length: 238m, but extendable using modular sections
Width: 7.3m
Maximum incline (drive-on/drive-off sections): 6.1%
Clearance in travel direction: 5.2m x 3.1m
Lateral clearance: 2.2m x 3.1m
Weight: around 1,200tonnes
Moving speed: around 0.5kph


Related Content

  • Help for US agencies’ to use new tool to boost concrete pavement quality
    April 23, 2014
    In a bid to reduce costs, increase pavement quality, and minimise travel delays caused by road construction, the US Federal Highway Administration (FHWA), the American Association of State Highway and Transportation Officials (AASHTO), and the Transportation Research Board (TRB) are to help agencies implement a tool that allows contractors to identify concrete pavement surface irregularities during construction. Real-time pavement smoothness has been selected for guided implementation under the second Stra
  • Volvo updates FMX construction trucks
    April 16, 2013
    Volvo Trucks has updated its FMX construction tipper range, first launched in 2010. The latest FMX adopts the Euro 6 engine line-up introduced earlier this year in the firm’s on-highway FM and FH trucks, with D11 offerings at 246-335kW and D13 engines delivering 313-402kW. These engines are equipped with non-cooled exhaust gas recirculation (EGR) and a diesel particulate filter (DPF). The FMX range is available with Volvo Dynamic Steering (VDS), which uses an electric motor to assist the hydraulic power ste
  • Trakpactor 320SR impact crusher from Powerscreen
    January 6, 2017
    Powerscreen’s new Trakpactor 320SR mid-sized horizontal impact crusher, sporting the rugged new look from the company, which maintains the traditional Powerscreen green colour while adopting a dark grey colour on the chassis and conveyors, is unveiled at CONEXPO-CON/AGG. The Trakpactor 320SR is redesigned with some key enhancements to offer operators and contractors excellent reduction and high consistency of product shape for performance in quarry and recycling applications. “The plant is capable of wo
  • Bentley announces finalists for the 2017 Be Inspired Awards
    August 11, 2017
    AECOM, Arcadis-WSP/PB, CH2M-Fairhurst and Highways England are among the finalists for this year’s Bentley awards for outstanding use of BIM – building information modelling. Bentley Systems, a provider of infrastructure software solutions, said that the winners will be announced at The Year in Infrastructure 2017 Conference to be held in Singapore this year, October 10-12. “The annual awards honour the extraordinary work of Bentley users advancing infrastructure design, construction, and operations through