Skip to main content

Testing and striping underway for Seattle’s Alaskan Way tunnel

Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap
August 31, 2018 Read time: 3 mins
Testing, testing: Seattle Tunnel Partners making sure that equipment and signage operates effectively in the soon-to-open Alaskan Way Tunnel in Seattle (photo courtesy WSDoT)
Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.


The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways.

STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an approximate three-week viaduct closure to realign the  SR 99 – called the Alaskan Way - into the new tunnel.

The project is called the Alaskan Way Viaduct Replacement Project after the section of SR 99 in Seattle called the Alaskan Way, a street running along the seafront. Part of the Alaskan Way is an aging 3.2km viaduct – opened in 1953 - which is being replaced by the 2.7km tunnel almost directly beneath it. This will free up waterfront area for major inner city development (see World Highways, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 33214 0 link-external key project report false /categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>, November 2017).

The multi-layered tests of the tunnel's operational and safety systems includes pre-functional tests to ensure working of individual equipment such as a sprinkler head. Functional tests check that the equipment works together as a system, for example multiple sprinklers. Finally, integrated testing checks that multiple systems function together - heat detectors and video cameras operate with the fire suppression system.

Striping of the road decks inside the tunnel is also continuing. The stripes separate a deck into two 3.3m lanes, a 2.4m shoulder on the left side and a 0.6m buffer on the right.

Kiewit Infrastructure West has started traffic signal, striping and roadway signage work to switch traffic on Alaskan Way from under the viaduct to the west of it. The viaduct will eventually be demolished after the tunnel is opened likely this fall.


Tunnel boring was completed last year by Bertha, the world’s largest diameter earth pressure balance tunnel boring machine at the time, with a cutterhead diameter of 17.5m. By the end of last year it had been dismantled, job completed.

Seattle Tunnel Partners - a joint venture of New York-based 4761 Dragados US (a subsidiary of Dragados, the construction division of ACS Group of Spain) and the general contractor Tutor Perini Corporation, based in California.

Apart from designing and building the tunnel - and owning Bertha - STP is responsible for building highway ramps and other connections at the north and south ends of the tunnel. STP is also constructing permanent buildings at the north and south portal to house lighting, ventilation and other essential tunnel systems

For more information about the Alaskan Way Viaduct Replacement Program, see the website:

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.alaskanwayviaduct.org false http://www.alaskanwayviaduct.org/ false false%>

For more information on companies in this article

Related Content

  • A sophisticated data communications system is offered by Trimble
    March 8, 2013
    Trimble says that its combined device for mobile communications and surveying data collection offers high performance and reliability. Called the Trimble Slate Controller, this rugged new unit is said to combine the convenience and ease-of-use of a smartphone with durability. Optimised for use with the Trimble Access field software and the Trimble R4 GNSS receiver, the Trimble Slate Controller supports a surveyor’s workflows. Offering voice, SMS text, and 3.75G cellular data transfer capabilities on GSM cel
  • High performance excavators from LiuGong
    January 6, 2017
    LiuGong is following up its introduction of its first E series excavator, the 922E, with a whole new range. The top-of-the-line model is the its 945E, which competes in the 45tonne class, features a 2.2m3 bucket and is powered by a Cummins diesel delivering 298kW. Also due are the 30tonne class 930E and 25tonne class 925E, which share similar features. The E-Series excavators are offered with the LiuGong Intelligent Power Control System (IPC), which provides more accurate matching and control over engine sp
  • High performance excavators from LiuGong
    February 8, 2013
    LiuGong is following up its introduction of its first E series excavator, the 922E, with a whole new range. The top-of-the-line model is the its 945E, which competes in the 45tonne class, features a 2.2m3 bucket and is powered by a Cummins diesel delivering 298kW. Also due are the 30tonne class 930E and 25tonne class 925E, which share similar features. The E-Series excavators are offered with the LiuGong Intelligent Power Control System (IPC), which provides more accurate matching and control over engine sp
  • REMU launches Combi E8 screening plant
    April 16, 2013
    Finnish company Remu has launched its new screening plant, the Remu Combi E8. A non-clogging screening plant for preparing topsoil and processing various waste materials, the re-engineered solutions have increased screening capacity by a wider 950mm screening table and a new 2.6m3 feeder unit.