Skip to main content

Swindon, UK A419 solar panels to double-up as noise barriers

A popular road near in the UK county of Wiltshire may be soundproofed using solar panels which double-up as noise barriers. Swindon Borough Council leaders are creating a working group to explore the idea of installing the panels along the A419 dual carriageway near Swindon. The electricity generated is set to fund the scheme, possibly the first of its kind in Britain and targeted for completion within two years. Parts of the A419 already have standard noise barriers, with solar panels expected to cost €1.1
August 1, 2013 Read time: 1 min
A popular road near in the UK county of Wiltshire may be soundproofed using solar panels which double-up as noise barriers.

Swindon Borough Council leaders are creating a working group to explore the idea of installing the panels along the A419 dual carriageway near Swindon.

The electricity generated is set to fund the scheme, possibly the first of its kind in Britain and targeted for completion within two years.

Parts of the A419 already have standard noise barriers, with solar panels expected to cost €1.14 million (£1 million) per 1.61 kilometres.

The scheme is said to be supported by transport ministers and the 2309 Highways Agency.

The technology proposed for use on the A419 is already in use in Germany, Austria and Italy.

A progress report from the council’s working party is set to be heard by the Conservative-run authority next month.

For more information on companies in this article

Related Content

  • More challenges for Stonehenge A303 scheme
    August 1, 2023
    National Highways’ Road Investment Strategy for England’s strategic roads has committed to upgrading many the remaining single carriageway sections of the A303.
  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer
  • Road markings important for road safety
    February 20, 2012
    Manufacturers are constantly upgrading marking materials and equipment. Now those responsible for highways are being asked to do more as Patrick Smith reports. A recent report claimed that nearly one-third of the length of Britain's single carriageway A-roads have white lines so worn out that they do not meet recognised standards. According to the LifeLines Report, an assessment of more than 2,400km of the road network, Britain's most dangerous roads have the most worn-out centre line markings of all, leavi
  • More countries look to warm mix
    November 21, 2019
    Though warm mix technology has been around for decades, take-up has been patchy - will renewed environmental pressure change that? asks Kristina Smith