Skip to main content

Swedish motorcycle test

In Sweden crash testing has been carried out using motorcycles for the first time. Four crash tests were carried out at the VTI crash laboratory in Linköping, Sweden, for the client, the insurance company Folksam. As a result, Swedish motorcyclists can expect safer barriers according to VTI, the Swedish National Road and Transport Research Insitute. The VTI have participated in two different projects with focus on better safety for motorcyclists. The first project was run in cooperation with the Swedish Mo
November 10, 2015 Read time: 2 mins
In Sweden crash testing has been carried out using motorcycles for the first time. Four crash tests were carried out at the 7264 VTI crash laboratory in Linköping, Sweden, for the client, the insurance company Folksam. As a result, Swedish motorcyclists can expect safer barriers according to VTI, the Swedish National Road and Transport Research Insitute.

The VTI have participated in two different projects with focus on better safety for motorcyclists. The first project was run in cooperation with the Swedish Motorcyclists Association (SMC) and the Swedish parapet and barrier association (SVBRF). This studied existing literature to describe state-of-the art in motorcycle to barrier crash interaction. In the second project, initiated by Folksam, four full-scale crash tests on barriers with different kinds of protection was executed.

The joint result from these two projects opened a possibility to run a final crash test with a simple prototype of a plastic cover to shield the sharp edge on the top of the barrier. According to VTI, this prototype will help reduce injuries to motorcyclists in the event of an impact. In the various tests, different kinds of motorcycle protection systems were installed on a traditional W-beam and sigma post barriers.

The cover will let the motorcyclist slide along the barrier instead of getting stuck, lowering the severity of injuries.

The positive outcome is all about covering sharp edges and protruding parts, including the posts of the barrier. The plastic tube is a cheap and simple way of demonstrating a principle but it is yet not a finished product according to VTI.
The VTI crash laboratory is an accredited test facility for the EN1317 European test procedure for barriers. Being part of the international work with the procedure research engineer at the VTI crash laboratory, Jan Wenäll, will bring this experience to the ongoing development of an additional procedure for motorcyclists addition to the same procedure.

For more information on companies in this article

Related Content

  • High-density polyethylene as a plastic additive
    November 18, 2021
    Using recycled plastic in a hot-mix asphalt requires choosing the right plastic with the appropriate mixing method, as Simon Tetley* in South Africa explains
  • Volvo CE’s Carl Slotte explains the division’s current line-up
    October 11, 2017
    Next year Volvo CE will be testing electric, hybrid and autonomous vehicles in a quarry. Carl Slotte, head of sales for EMEA, says no company by itself will win market share. David Arminas reports from Germany The driver of the charter bus stood outside the hotel in Trier, Germany, and waved at a passing local city bus. “I know the driver,” he told one of the assembled journalists waiting for the group’s ride to the nearby Volvo CE plant. “He is retired but they brought him back because young people th
  • Interview with Jean Todt – FIA president
    January 19, 2018
    Reducing the death and injury toll on the world's roads is a key priority. It is estimated that every year, 1.25 million people die on the world’s roads. With motorisation and urbanisation to increase in many parts of the developing world in the years to come, there is every likelihood that this number could rise. Can you explain why so many lives are needlessly lost every year on our roads and why greater action isn’t being taken to address this?
  • Colombia’s tunnel of woe faces further setback
    May 19, 2017
    The troubled tunnel construction project in Colombia to build the La Linea link has faced yet a further setback in its long tale of woe. The tender for the completion of the final 12% of the tunnel project has not managed to attract any interest from contractors. The budget for this work is an estimated US$77 million. A new tender process is being launched, with a submission deadline of 6th June 2017 and planned winner announcement on 4th July 2017. The contractor that had been building the tunnel failed to