Skip to main content

ERF abstract submission extension for 2014 Roadside Safety Design Conference

The European Union Road Federation (ERF) has extended the deadline for submission of abstracts for the 2014 edition of the AFB20(2) Roadside Safety Design Conference until 30 June 2014. The Conference on 5 November 2014 at the CEN headquarters in Brussels, Belgium will be the perfect opportunity for road safety experts around the globe to gather and exchange information concerning the latest trends and developments in the area of passive safety and road safety design. Abstracts should be a maximum two pag
June 18, 2014 Read time: 2 mins
The 2866 European Union Road Federation (ERF) has extended the deadline for submission of abstracts for the 2014 edition of the AFB20(2) Roadside Safety Design Conference until 30 June 2014.

The Conference on 5 November 2014 at the CEN headquarters in Brussels, Belgium will be the perfect opportunity for road safety experts around the globe to gather and exchange information concerning the latest trends and developments in the area of passive safety and road safety design.

Abstracts should be a maximum two pages and be of technical relevance and interest. No commercial paper or advertising is allowed. The abstracts will be revised by a technical committee made up of Marco ANGHILERI (IT); Ali ATAHAN (TK); Jean BLOCH (FR); Claudi COFANO (BE); Jan DROEGE (DE); Raphael GRZEBIETA (AU); Joseph MARRA (BE); Rod TROUTBECK (AU); and Gavin WILLIAMS (UK).

Topics for Presentations are: EN 1317 – Implementation and Application Issues (e.g. EN 1317 updates, the implications of CE marking and its effects, use of simulations, EN 1317 and real-life issues, installation/maintenance of VRS, local authority controls for RRS)

Innovation for road side safety (e.g. roadside design, developing a safer road, geometric and alignment of roads, longitudinal barriers developments, crash cushion developments, crashworthy terminals developments, transition developments, energy absorbing poles developments, high friction technology developments, rumble strip developments, safety edge developments, pedestrian parapets)

Vulnerable Road Users and Road Safety Furniture / Work zone safety (e.g. motorcyclist and VRS, safer road design for VRU, TMA’s, positive protection for Work Zones)

To submit your abstract and to register, contact %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkEmail Konstandinos Diamandouros email: [email protected] false mailto:[email protected] true false%>

For more information on companies in this article

Related Content

  • LiuGong turns its attention to Europe
    January 6, 2017
    Chinese group explains why it is expanding into Europe, stressing the importance of the market to the long-term health of the industry – and Dressta, the Polish firm LiuGong acquired, talks about its own plans.
  • LiuGong turns its attention to Europe
    April 20, 2015
    Chinese group explains why it is expanding into Europe, stressing the importance of the market to the long-term health of the industry – and Dressta, the Polish firm LiuGong acquired, talks about its own plans.
  • Arja Group offers range of new crushers
    March 11, 2013
    The Arja Group is broadening its range of crushing and screening equipment with its latest generation of impact crushers. The new series TAURO 10 PE models join the range, along with the durable MA 0806 jaw crushers and HN 36-3 screens. The new impact crushers are designed to work with highly abrasive materials and can also be used for soft materials. The firm claims that these impact crushers offer benefits over cone crushers in terms of material shape and reduced fines. The new TAURO 10 PE features advanc
  • Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine
    November 1, 2016
    It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho