Skip to main content

Degaroute skipline markings

Of the 8,050km of tollway roads in the United States, the Illinois State Toll Highway Authority manages 460km of them As part of the maintenance programme for this network of five highways, the Illinois State Toll Highway Authority has partnered with Applied Research Associates to manage and monitor the performance of all their pavement marking programmes, providing recommendations for striping projects.
May 6, 2016 Read time: 3 mins

Of the 8,050km of tollway roads in the United States, the Illinois State Toll Highway Authority manages 460km of them.

As part of the maintenance programme for this network of five highways, the Illinois State Toll Highway Authority has partnered with Applied Research Associates to manage and monitor the performance of all their pavement marking programmes, providing recommendations for striping projects.

When searching for a road marking solution that would provide the benefits of a long service life, cold weather application, excellent adhesion to concrete and asphalt and optimal wet night visibility, 1659 Degaroute-based MMA road markings were chosen by the Illinois Tollway Authority for an evaluation.

The project is to assess the performance of Degaroute-based spray and structured markings to determine the durability, dry retroreflectivity and wet recovery retroreflectivity over the service life. After only one year of the Degaroute markings being applied, data collected by Applied Research Associates are already showing exceptional durability.

The authority said it noticed the optimal wet-night visibility that the Degaroute road markings provided. From this and in 2014, the Authority worked with Applied Research Associates to apply Degaroute spray and road markings to a 1.6km stretch of Interstate Highway 88 as an evaluation project to measure performance over their life cycle.

The evaluation area comprised of two 1.6km segments of skip markings, with each segment separately dedicated to spray and structure pattern.

In preparation for the application of the Degaroute systems, the existing epoxy road markings were ground off the Portland cement concrete surface and grooves were mechanically cut at a 40mil (1mm) depth. One hundred thin film spray skip markings were then applied within the grooves of the first mile of I-88 at a thickness of 30mils (0.75mm), measuring 15.2cm wide by 7.6m long.

Due to the thin application and fast curing capabilities of the spray, the skip lines were completely dry only eight minutes after they were applied.

 Following the application of the spray skip lines, Degaroute-based structured markings were applied along the second 1.6km of I-88. Applied at the same count and dimensions, the structure pattern skip lines were extruded into the grooves at a thickness of 100mils (2.5mm) and were completely cured within 30 minutes of application.

The pattern of Degaroute-based  structure markings allows for optimal wet-night visibility, using the vertical surface area of the marking to reflect light from oncoming vehicles during inclement weather. Since wet retroreflectivity data values will be measured during the assessment of this project, Applied Research Associates were particularly interested in this application characteristic.

 Applied Research Associates will perform annual evaluations throughout the entire “service life” of the Degaroute-based MMA road markings, compiling all data into a final report for use by the authority when deciding which products to specify for striping projects. The final data will include dry retroreflectivity, wet recovery retroreflectivity and overall material presence.

However, since the completion of this application on I-88, Applied Research Associates has compiled a year of data. After enduring a harsh 2014–2015 winter with multiple snowplow events along the Illinois Tollway, the presence of all markings has maintained at a high level.

Dry retroreflectivity readings registered at about an average of 400mcd for the spray skip lines and 550mcd for the structured skip lines. Overall, the wet recovery retroreflectivity for both applications were reported at about 85 mcd and 100 mcd respectively.

“The MMA road marking systems have proven to be every bit as durable as we had heard, looking almost as if they were applied just yesterday,” said Carmine Dwyer, senior engineer at Applied Research.

Applied Research Associates is in discussion with the Tollway to perform an additional test evaluation, applying Degaroute-based road markings to an asphalt surfaced pavement section.

For more information on companies in this article

Related Content

  • Stiffer road surfaces could save billions in fuel say US researchers
    February 27, 2014
    There are fears that President Barack Obama is overlooking the benefits of good highway design following his recent announcement that he plans to impose higher fuel efficiency standards for medium and heavy-duty trucks by 2016.
  • New concrete testing technologies improve speed, safety and quality
    July 8, 2016
    Developments in data processing and management are revolutionising the way concrete strengths can be measured and used to improve efficiencies - Kristina Smith reports on two new technologies A new system that uses thermal imaging to measure the strength of sprayed concrete tunnel linings is being trialled for the first time in London. The brainchild of Dr Benoit Jones, managing director of Inbye Engineering, the technique could lead to improvements in safety, quality and – in the longer run – productivi
  • How waste plastic and soybean oil are helping our roads last longer
    April 13, 2018
    A new super-modifier is born from waste plastic in Italy and a soybean-based rejuvenator from the US spreads from its home market. By Kristina Smith The two bitumen technologies featured this month come from almost opposing sources. One emerges from the human-created plastic waste plaguing our planet, the other from a plant. However, both technologies have been created with the same aims: to increase the life of roads, saving cost and ultimately reducing the impact of road building on the planet. A coll
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO