Skip to main content

Degaroute skipline markings

Of the 8,050km of tollway roads in the United States, the Illinois State Toll Highway Authority manages 460km of them As part of the maintenance programme for this network of five highways, the Illinois State Toll Highway Authority has partnered with Applied Research Associates to manage and monitor the performance of all their pavement marking programmes, providing recommendations for striping projects.
May 6, 2016 Read time: 3 mins

Of the 8,050km of tollway roads in the United States, the Illinois State Toll Highway Authority manages 460km of them.

As part of the maintenance programme for this network of five highways, the Illinois State Toll Highway Authority has partnered with Applied Research Associates to manage and monitor the performance of all their pavement marking programmes, providing recommendations for striping projects.

When searching for a road marking solution that would provide the benefits of a long service life, cold weather application, excellent adhesion to concrete and asphalt and optimal wet night visibility, 1659 Degaroute-based MMA road markings were chosen by the Illinois Tollway Authority for an evaluation.

The project is to assess the performance of Degaroute-based spray and structured markings to determine the durability, dry retroreflectivity and wet recovery retroreflectivity over the service life. After only one year of the Degaroute markings being applied, data collected by Applied Research Associates are already showing exceptional durability.

The authority said it noticed the optimal wet-night visibility that the Degaroute road markings provided. From this and in 2014, the Authority worked with Applied Research Associates to apply Degaroute spray and road markings to a 1.6km stretch of Interstate Highway 88 as an evaluation project to measure performance over their life cycle.

The evaluation area comprised of two 1.6km segments of skip markings, with each segment separately dedicated to spray and structure pattern.

In preparation for the application of the Degaroute systems, the existing epoxy road markings were ground off the Portland cement concrete surface and grooves were mechanically cut at a 40mil (1mm) depth. One hundred thin film spray skip markings were then applied within the grooves of the first mile of I-88 at a thickness of 30mils (0.75mm), measuring 15.2cm wide by 7.6m long.

Due to the thin application and fast curing capabilities of the spray, the skip lines were completely dry only eight minutes after they were applied.

 Following the application of the spray skip lines, Degaroute-based structured markings were applied along the second 1.6km of I-88. Applied at the same count and dimensions, the structure pattern skip lines were extruded into the grooves at a thickness of 100mils (2.5mm) and were completely cured within 30 minutes of application.

The pattern of Degaroute-based  structure markings allows for optimal wet-night visibility, using the vertical surface area of the marking to reflect light from oncoming vehicles during inclement weather. Since wet retroreflectivity data values will be measured during the assessment of this project, Applied Research Associates were particularly interested in this application characteristic.

 Applied Research Associates will perform annual evaluations throughout the entire “service life” of the Degaroute-based MMA road markings, compiling all data into a final report for use by the authority when deciding which products to specify for striping projects. The final data will include dry retroreflectivity, wet recovery retroreflectivity and overall material presence.

However, since the completion of this application on I-88, Applied Research Associates has compiled a year of data. After enduring a harsh 2014–2015 winter with multiple snowplow events along the Illinois Tollway, the presence of all markings has maintained at a high level.

Dry retroreflectivity readings registered at about an average of 400mcd for the spray skip lines and 550mcd for the structured skip lines. Overall, the wet recovery retroreflectivity for both applications were reported at about 85 mcd and 100 mcd respectively.

“The MMA road marking systems have proven to be every bit as durable as we had heard, looking almost as if they were applied just yesterday,” said Carmine Dwyer, senior engineer at Applied Research.

Applied Research Associates is in discussion with the Tollway to perform an additional test evaluation, applying Degaroute-based road markings to an asphalt surfaced pavement section.

For more information on companies in this article

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • WeatherGrip from WJ uses methyl methacrylate technology
    January 6, 2015
    The highly durable feature of WeatherGrip, the coloured surfacing system from WJ, makes it suitable for areas subjected to high wear and stress through braking forces of vehicles and bicycles. As such, WeatherGrip meets the Transport for London (TfL) specification for shared use of cycleways and has been used on London’s cycle super-highways. WeatherGrip, part of WJ's WeatherLine range, is a cold applied coloured surfacing system based on two-part solvent-free methyl methacrylate (MMA) technology.
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor