Skip to main content

Degaroute skipline markings

Of the 8,050km of tollway roads in the United States, the Illinois State Toll Highway Authority manages 460km of them As part of the maintenance programme for this network of five highways, the Illinois State Toll Highway Authority has partnered with Applied Research Associates to manage and monitor the performance of all their pavement marking programmes, providing recommendations for striping projects.
May 6, 2016 Read time: 3 mins

Of the 8,050km of tollway roads in the United States, the Illinois State Toll Highway Authority manages 460km of them.

As part of the maintenance programme for this network of five highways, the Illinois State Toll Highway Authority has partnered with Applied Research Associates to manage and monitor the performance of all their pavement marking programmes, providing recommendations for striping projects.

When searching for a road marking solution that would provide the benefits of a long service life, cold weather application, excellent adhesion to concrete and asphalt and optimal wet night visibility, 1659 Degaroute-based MMA road markings were chosen by the Illinois Tollway Authority for an evaluation.

The project is to assess the performance of Degaroute-based spray and structured markings to determine the durability, dry retroreflectivity and wet recovery retroreflectivity over the service life. After only one year of the Degaroute markings being applied, data collected by Applied Research Associates are already showing exceptional durability.

The authority said it noticed the optimal wet-night visibility that the Degaroute road markings provided. From this and in 2014, the Authority worked with Applied Research Associates to apply Degaroute spray and road markings to a 1.6km stretch of Interstate Highway 88 as an evaluation project to measure performance over their life cycle.

The evaluation area comprised of two 1.6km segments of skip markings, with each segment separately dedicated to spray and structure pattern.

In preparation for the application of the Degaroute systems, the existing epoxy road markings were ground off the Portland cement concrete surface and grooves were mechanically cut at a 40mil (1mm) depth. One hundred thin film spray skip markings were then applied within the grooves of the first mile of I-88 at a thickness of 30mils (0.75mm), measuring 15.2cm wide by 7.6m long.

Due to the thin application and fast curing capabilities of the spray, the skip lines were completely dry only eight minutes after they were applied.

 Following the application of the spray skip lines, Degaroute-based structured markings were applied along the second 1.6km of I-88. Applied at the same count and dimensions, the structure pattern skip lines were extruded into the grooves at a thickness of 100mils (2.5mm) and were completely cured within 30 minutes of application.

The pattern of Degaroute-based  structure markings allows for optimal wet-night visibility, using the vertical surface area of the marking to reflect light from oncoming vehicles during inclement weather. Since wet retroreflectivity data values will be measured during the assessment of this project, Applied Research Associates were particularly interested in this application characteristic.

 Applied Research Associates will perform annual evaluations throughout the entire “service life” of the Degaroute-based MMA road markings, compiling all data into a final report for use by the authority when deciding which products to specify for striping projects. The final data will include dry retroreflectivity, wet recovery retroreflectivity and overall material presence.

However, since the completion of this application on I-88, Applied Research Associates has compiled a year of data. After enduring a harsh 2014–2015 winter with multiple snowplow events along the Illinois Tollway, the presence of all markings has maintained at a high level.

Dry retroreflectivity readings registered at about an average of 400mcd for the spray skip lines and 550mcd for the structured skip lines. Overall, the wet recovery retroreflectivity for both applications were reported at about 85 mcd and 100 mcd respectively.

“The MMA road marking systems have proven to be every bit as durable as we had heard, looking almost as if they were applied just yesterday,” said Carmine Dwyer, senior engineer at Applied Research.

Applied Research Associates is in discussion with the Tollway to perform an additional test evaluation, applying Degaroute-based road markings to an asphalt surfaced pavement section.

For more information on companies in this article

Related Content

  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Quality assured with asphalt testing equipment
    March 15, 2012
    Equipment for checking out the various qualities required of asphalt in road construction is becoming more sophisticated
  • Using radar to deliver a fine runway finish
    April 4, 2014
    Radar Portal Systems (RPS) has spent a lot of time developing its sophisticated pavement top-surface photometric imaging system so it can cater specifically for the aviation market. This has now been specially developed for use on aircraft runways and taxiways The system was recently used at Brisbane Airport to survey runway and runway shoulders, collecting photometric top-surface data at a 4m width at speeds of up to 100km/h. This dataset allows the firm to display meshing data of the runway surface showin
  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul