Skip to main content

Connect Plus joins Highways Agency’s plea to drivers to take care through road works

Connect Plus, the design, build, finance and operating company for southern England’s M25 and its adjoining trunk routes, last week joined with the Highways Agency to convey vital messages to drivers passing through road works. The company, a joint venture consisting of Balfour Beatty, Skanska, Atkins and Egis Projects SA, was participating in the Highways Agency Road Worker Safety Week (21-28 October), which aimed to get across to the public some of the dangers road workers face in their work close to fas
October 30, 2013 Read time: 2 mins
Connect Plus staff with members of the public at South Mimms services during the UK’s Road Safety Week

Connect Plus, the design, build, finance and operating company for southern England’s M25 and ITS adjoining trunk routes, last week joined with the 2309 Highways Agency to convey vital messages to drivers passing through road works.

The company, a joint venture consisting of 1146 Balfour Beatty, 2296 Skanska, 3005 Atkins and 2376 EGIS Projects SA, was participating in the Highways Agency Road Worker Safety Week (21-28 October), which aimed to get across to the public some of the dangers road workers face in their work close to fast moving traffic. In the last three years, eight road workers have lost their lives in accidents at the UK roadside.

Connect Plus, which maintains the M25 and employs over 200 road workers, held an information session at Cobham Services where the public were able to view the latest awareness videos about road worker safety and talk to road workers about some of the dangers they face.  A similar session was held at South Mimms services.  

Connect Plus has been working with the Highways Agency and ITS supply chain partners to reduce the risks road workers face, including trialling systems to reduce live carriageway crossings (one of the greatest risks for road workers) by nearly half, as well as introducing vehicles which offer greater protection from collisions.

To support Road Worker Safety Week, Connect Plus also jointly funded the first ever national road worker safety radio campaign, ‘Take Extra Care’, which is being broadcast until 2 November and features three hard-hitting messages focusing on the lack of awareness of some drivers of road workers.

Tim Jones, chief executive of Connect Plus, said,  “Some drivers still find it acceptable to put road workers’ lives in danger by not taking enough care when they pass through road works and this can have tragic consequences.

“Our road workers deserve to work in an environment as safe as that of any other and we fully support the Highways Agency’s campaign to increase awareness among motorists of the need to respect road works.”

For more information on companies in this article

Related Content

  • SRL’s outta sight VMS
    June 10, 2025


    England’s National Highways agency is using a variable message sign(VMS)  to display non-regulatory messages to indicate that maintenance teams may be out of sight.

    The is the first time that such messages have been displayed in an effort to better communicate to drivers that ahead lay obstacles, diversions road works. The system from SRL Traffic Systems is displaying wording not usually used, including ‘Working even out of view’, to provide an awareness of operations not within eyesight of a driver or outside of the public eye.

  • Premium ponds
    April 25, 2012
    A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
  • Premium ponds
    May 3, 2012
    A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
  • Mersey Gateway: Consortia Talks
    April 4, 2012
    The competitive dialogue phase of the Mersey Gateway Project has begun. The project team are said to have held initial meetings with the three shortlisted bidding consortia, and will be working closely with each of them over the coming months. The aim is for each of the three bidders to submit their detailed proposals by the end of 2012, with an announcement about a preferred bidder likely to come in spring 2013. The value of the construction phase of the project, including land, is estimated at US$961milli