Skip to main content

Connect Plus joins Highways Agency’s plea to drivers to take care through road works

Connect Plus, the design, build, finance and operating company for southern England’s M25 and its adjoining trunk routes, last week joined with the Highways Agency to convey vital messages to drivers passing through road works. The company, a joint venture consisting of Balfour Beatty, Skanska, Atkins and Egis Projects SA, was participating in the Highways Agency Road Worker Safety Week (21-28 October), which aimed to get across to the public some of the dangers road workers face in their work close to fas
October 30, 2013 Read time: 2 mins
Connect Plus staff with members of the public at South Mimms services during the UK’s Road Safety Week

Connect Plus, the design, build, finance and operating company for southern England’s M25 and ITS adjoining trunk routes, last week joined with the 2309 Highways Agency to convey vital messages to drivers passing through road works.

The company, a joint venture consisting of 1146 Balfour Beatty, 2296 Skanska, 3005 Atkins and 2376 EGIS Projects SA, was participating in the Highways Agency Road Worker Safety Week (21-28 October), which aimed to get across to the public some of the dangers road workers face in their work close to fast moving traffic. In the last three years, eight road workers have lost their lives in accidents at the UK roadside.

Connect Plus, which maintains the M25 and employs over 200 road workers, held an information session at Cobham Services where the public were able to view the latest awareness videos about road worker safety and talk to road workers about some of the dangers they face.  A similar session was held at South Mimms services.  

Connect Plus has been working with the Highways Agency and ITS supply chain partners to reduce the risks road workers face, including trialling systems to reduce live carriageway crossings (one of the greatest risks for road workers) by nearly half, as well as introducing vehicles which offer greater protection from collisions.

To support Road Worker Safety Week, Connect Plus also jointly funded the first ever national road worker safety radio campaign, ‘Take Extra Care’, which is being broadcast until 2 November and features three hard-hitting messages focusing on the lack of awareness of some drivers of road workers.

Tim Jones, chief executive of Connect Plus, said,  “Some drivers still find it acceptable to put road workers’ lives in danger by not taking enough care when they pass through road works and this can have tragic consequences.

“Our road workers deserve to work in an environment as safe as that of any other and we fully support the Highways Agency’s campaign to increase awareness among motorists of the need to respect road works.”

For more information on companies in this article

Related Content

  • Surecam keeps Peoplesafe in the UK
    October 2, 2023
    Ringway Jacobs, a UK highway services provider, adopted the video-enabled lone worker protection service from Peoplesafe and Surecam earlier this year for its lone workers and maintenance teams including those doing walked visual inspections of footways and highways.
  • IAM suggests confusion over UK’s SMART motorways
    April 13, 2015
    The Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion exists amongst UK drivers on how best to use SMART motorways. These were officially introduced around this time in 2014 to replace Managed Motorways as the solution to the UK’s congested major routes. However concerns have been raised over the safety of the SMART motorways. England’s first all-lane running motorway, without a hard shoulder, was the 2.5km stretch of the M25 between junctions 23 and 25. Complete schemes
  • Highways England to trial different speeds through road works
    August 6, 2018
    Highways England is trialling different speed limits through roadworks during different times in order to respond to drivers’ feedback. Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads, said it is acting on drivers’ frustration with roadworks. Speed through motorway roadworks could be increased depending on what day of the week they are travelling. The decision follows earlier trials to increase the speed l
  • Recycled organic compost stabilises embankments
    February 21, 2012
    Waste & Resources Action Programme (WRAP) is a UK government-funded body designed to encourage greater resource efficiency. This body completed a trial with contractor Balfour Beatty and the Highways Agency to test the innovative use of recycled organic compost along roadside embankments.