Skip to main content

Call for action on road markings

In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves. Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028. Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough
April 11, 2012 Read time: 2 mins
RSSIn Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves.

4798 Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028.

Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough for traffic measures, which are due to be examined.

These include calls for double yellow lines, parking restrictions, disabled parking bays, school keep clear marks and waiting time restrictions.

Speaking to the Staffordshire Newsletter, County Councillor Len Bloomer said: “I worked out it will be 2028 before we clear the backlog. I could quite easily go round my patch and add another six. The list is too big. Something has got to be done about it.”

It is reported that Stafford Borough and Staffordshire County councillors intend to lobby the Government for a change in legislation to cut red tape surrounding traffic management orders.

For more information on companies in this article

Related Content

  • Fast bridge building in Tennessee
    July 5, 2016
    The Tennessee Department of Transportation (TDOT) recently completed the Fast Fix 8 bridge project in Nashville, with help from a Power Curbers slipformer belonging to Irwin Concrete Construction. TDOT’s goal was to replace eight ageing interstate bridges along Interstate 40 through Nashville using a process called Accelerated Bridge Construction (ABC). This uses fast-paced, around-the-clock work to limit road closures and speed up bridge completion, impacting surrounding communities as little as possibl
  • US road safety record
    April 26, 2012
    The latest official statistics from the US on road accidents show that fatality levels on the nation's roads have dropped to the lowest figures seen for more than six decades. The information was released by US Transportation Secretary Ray LaHood, revealing that highway deaths fell to 32,885 for 2010, the lowest level since 1949.
  • EarthSense and Tantalum in UK project to cut road air pollution
    June 29, 2018
    Air quality specialist EarthSense is working with Oxfordshire County Council in England and connected vehicle company Tantalum to understand road traffic’s impact on air quality. Council fleet vehicles are being fitted with EarthSense’s Zephyr air quality measuring sensors that give real-time data on vehicle emissions and air quality along the route. The data collected by EarthSense will be used to coordinate traffic light control in an attempt to mitigate road congestion and, therefore, air pollution.
  • UK study casts doubt on speed camera effectiveness
    June 11, 2013
    A study by the RAC Foundation in the UK has raised doubts about the usefulness of speed cameras. The research has prompted the RAC Foundation to write to seven local authorities about 21 camera sites where there has been a noticeable increase in the number of accidents since the installation of speed cameras. The study based on speed camera data going back to 1990 identified nine risky camera sites in Merseyside, north-west England and three in Staffordshire and Stoke on Trent, both in central England.