Skip to main content

WJ Guardian system keeps stud installers safer in workzones

WJ’s latest innovation is a method of road stud installation designed to remove vulnerable operatives from the carriageway The bespoke design of the WJ Guardian system allows the complete road stud installation process to take place while protecting operatives within an integrated safety cell of an 18tonne truck. The UK has used 12 million road studs on its national and local road network, all requiring maintenance or replacement at some point. Traditional methods of installation by hand or milling ma
January 26, 2017 Read time: 3 mins
Installation operatives out of harm's way
WJ’s latest innovation is a method of road stud installation designed to remove vulnerable operatives from the carriageway

The bespoke design of the 8037 WJ Guardian system allows the complete road stud installation process to take place while protecting operatives within an integrated safety cell of an 18tonne truck.

The UK has used 12 million road studs on its national and local road network, all requiring maintenance or replacement at some point. Traditional methods of installation by hand or milling machine require operatives to be in the centre of the carriageway and, therefore, at risk of injury while working within live traffic conditions.

That risk varies from site to site, but always with a need for safety zones, either stop/stop type traffic management or road closures, to comply with the regulatory requirements.

The WJ Guardian method does not negate this need for safety zones, but it does significantly reduce the actual safe work zone required. The method ensures that the operatives do not need to stand and operate equipment from the opposite carriageway to the vehicle. Instead, they are protected within the vehicle’s safety cell as well as within a regulated safety zone.  

The development provides designers with the potential to eliminate a substantial number of road closures and reduce disruption within communities close to the work. WJ’s recent development focus has been on designing out risk through engineering and using its road marking vehicles as a protective safety barrier (see box). The patent pending WJ Guardian road stud installation technology is Phase 2 of a development project led by WJ’s engineering division in Elland, West Yorkshire in the UK.

With computer-aided design (CAD) software, phase 1 involved development of a lateral moving milling head so the installation vehicle would not need to straddle the centre of the road. CAD was used to simulate and validate the mechanical and physical properties of the design, ensuring that a legally compliant, robust and safe process was achieved even before component parts were manufactured and the truck was built.
Phase 2 involved the full design of a specialist installation vehicle with a protected control hub cell integrated within the chassis. It was important that a side under run device used fully complied with stringent requirements within the UK’s statutory Individual Vehicle Approval (IVA) scheme. From this safe position, the road operative activates the drill, vacuums up debris, applies hot bitumen grout and places the road stud before the driver of the vehicle moves onto the next position.

The Guardian system can be used to install all types of road studs. But, it was with this process in mind that WJ also developed the BSEN 1463 approved Allux prismatic road stud complete with stabilising shank.

WJ enthusiastically engage and share best practice in this way with clients, the 5149 Road Safety Markings Association (RSMA) and other stakeholders to establish the best work-related health and safety practice. Many of WJ’s ideas have contributed to improvements across the highways industry.

George Lee, chief executive of the UK’s Road Safety Markings Association, said the system was “a real step change in road worker safety”.

WJ is in the process of retrofitting operator platforms to many of their standard studding rigs so that a measure of safety can be extended to other operatives.

For more information on companies in this article

Related Content

  • European regulations for engine emissions are getting tougher
    January 4, 2013
    Emissions remain the focus for engine development but equipment manufacturers want clarity from regulators. Emissions remain a major challenge for the off-highway construction equipment market. The EU has tough targets in this respect and its objective is an overall reduction of CO2 emissions of 80-95% by the year 2050, compared to 1990 levels. There is considerable research already underway on how to reduce fuel consumption and to help ensure the security of energy supply. A number of industry sectors, suc
  • Hardstaff Barriers to recycle all PPE
    February 8, 2022
    Hardstaff is working with Granite Workwear which has launched its own textile destruction and recycling service for old or damaged workwear and personal protective equipment - PPE.
  • Mega city transport in Mexico
    June 13, 2012
    Rapid urban growth is resulting in massive mega cities with major transport needs and Mexico City is one of the world’s largest – Mike Woof reports Mexico City is a vast, sprawling metropolis and one of the world’s largest cities, resulting in huge problems for its inhabitants, particularly with regard to infrastructure. Measuring population size is an inexact science for large cities as suburban areas can add to the figures considerably, especially in developing nations where unplanned expansion is as comm
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w