WJ Guardian system keeps stud installers safer in workzones

WJ’s latest innovation is a method of road stud installation designed to remove vulnerable operatives from the carriageway The bespoke design of the WJ Guardian system allows the complete road stud installation process to take place while protecting operatives within an integrated safety cell of an 18tonne truck. The UK has used 12 million road studs on its national and local road network, all requiring maintenance or replacement at some point. Traditional methods of installation by hand or milling ma
January 26, 2017 Read time: 3 mins
Installation operatives out of harm's way
WJ’s latest innovation is a method of road stud installation designed to remove vulnerable operatives from the carriageway

The bespoke design of the 8037 WJ Guardian system allows the complete road stud installation process to take place while protecting operatives within an integrated safety cell of an 18tonne truck.

The UK has used 12 million road studs on its national and local road network, all requiring maintenance or replacement at some point. Traditional methods of installation by hand or milling machine require operatives to be in the centre of the carriageway and, therefore, at risk of injury while working within live traffic conditions.

That risk varies from site to site, but always with a need for safety zones, either stop/stop type traffic management or road closures, to comply with the regulatory requirements.

The WJ Guardian method does not negate this need for safety zones, but it does significantly reduce the actual safe work zone required. The method ensures that the operatives do not need to stand and operate equipment from the opposite carriageway to the vehicle. Instead, they are protected within the vehicle’s safety cell as well as within a regulated safety zone.  

The development provides designers with the potential to eliminate a substantial number of road closures and reduce disruption within communities close to the work. WJ’s recent development focus has been on designing out risk through engineering and using its road marking vehicles as a protective safety barrier (see box). The patent pending WJ Guardian road stud installation technology is Phase 2 of a development project led by WJ’s engineering division in Elland, West Yorkshire in the UK.

With computer-aided design (CAD) software, phase 1 involved development of a lateral moving milling head so the installation vehicle would not need to straddle the centre of the road. CAD was used to simulate and validate the mechanical and physical properties of the design, ensuring that a legally compliant, robust and safe process was achieved even before component parts were manufactured and the truck was built.
Phase 2 involved the full design of a specialist installation vehicle with a protected control hub cell integrated within the chassis. It was important that a side under run device used fully complied with stringent requirements within the UK’s statutory Individual Vehicle Approval (IVA) scheme. From this safe position, the road operative activates the drill, vacuums up debris, applies hot bitumen grout and places the road stud before the driver of the vehicle moves onto the next position.

The Guardian system can be used to install all types of road studs. But, it was with this process in mind that WJ also developed the BSEN 1463 approved Allux prismatic road stud complete with stabilising shank.

WJ enthusiastically engage and share best practice in this way with clients, the 5149 Road Safety Markings Association (RSMA) and other stakeholders to establish the best work-related health and safety practice. Many of WJ’s ideas have contributed to improvements across the highways industry.

George Lee, chief executive of the UK’s Road Safety Markings Association, said the system was “a real step change in road worker safety”.

WJ is in the process of retrofitting operator platforms to many of their standard studding rigs so that a measure of safety can be extended to other operatives.

For more information on companies in this article

Related Content

  • Minimising the problems of construction disputes
    September 30, 2013
    *Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects Disputes and the construction industry are synonymous with each other. In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.
  • Embedded sensors help deliver self-monitoring roads
    November 22, 2021
    As road authorities look to automate their road monitoring and maintenance, we will need more and more sensors within our highway networks
  • Thermal Road Repair’s updated pavement heater is now automatic
    August 7, 2017
    Aidan Conway, founder of Thermal Road Repairs, the UK manufacture of paver-mounted pavement heaters, explains how the latest version operates. The equipment, which allows asphalt to be laid seamlessly, eliminates joints from the outset. The latest version of the paver-mounted pavement heater from Thermal Road Repairs includes start-stop technology. This allows the computerised equipment to operate independently while synchronising with the paver. In TRR’s original system this was a manual process, explains
  • Naylor drains away waste water concerns
    January 26, 2017
    A bespoke waste water drainage system saved time and money on a recent UK motorway scheme Work on the London’s M25 motorway Junction 30/A13 Corridor Relieving Congestion Scheme is being undertaken by joint venture contractor Balfour Beatty/Skanska. The project is valued at nearly €91 million and completion is for autumn 2016. There has been a successful continual programme of clean-up using road-sweeper/gulley cleaning trucks to remove detritus from the works areas. Disposal of this type of waste w