Skip to main content

Streamlined, efficient road marking

Roadmarking contractor DBi Prismo has rolled out an iPhone application strategy to ensure seamless communication between its on-site workforce and office based departments.
February 24, 2012 Read time: 2 mins

Roadmarking contractor DBi Prismo has rolled out an iPhone application strategy to ensure seamless communication between its on-site workforce and office based departments.

The tool was developed by mobile technology strategist Answer and allows real-time reporting and communication, cutting DBi Prismo’s reliance on paperwork and making annual savings of over €344,150 in administration costs.
The Cloud-hosted mobile workforce management system is called Yesterday’s Internal Knowledge (YIK) and allows real-time reporting to and from the workforce and to the customer. It provides instant updates for any type of weather, travel or job specification changes and rapid evidential reporting using the device’s camera. Previously documentation would be couriered between sites or information would be transmitted via a vehicle-based system.

At the beginning of each day, mandatory vehicle checks are managed by the system as part of extensive health and safety requirements built into the system’s processes. Once approved, teams are provided with the day’s schedule, dimensions/specifications, location and route by the tool, creating significant time and cost-savings. The system also allows teams to directly report on stock requirements, condition of the location and confirmation of job completion before being sent details of the next task.
In addition to streamlined job workflow, DBi Prismo has seen an improvement in customer invoicing, down from 7-8 weeks to the next day and invoice disputes dropping from over 50% to just 5%. An employee survey also revealed a boost in workforce morale due to the system’s ease-of-use and ability to track wages through an e-timesheet. The smartphones have proven to be robust given the difficult environments the teams work in, but also bring a range of communication options including phone, text, e-mail and intranet access as opposed to the previous vehicle-based units.

DBi Prismo says that using this technology has led to significant cost savings over the previous paper-based system and provides the firm with daily cost and productivity data, while the picture-based dashboard is said to cut errors.

Related Content

  • Information technology and transport development
    February 16, 2012
    A team of eminent Russian specialists* introduce exciting new information technologies, such as the Internet of Things, and foresee their promising applications in the field of transport infrastructure development
  • Milling accurately for construction efficiency
    May 16, 2014
    The two-way flow of machine data is a crucial issue for machine optimisation and new telematics systems are becoming increasingly important in construction Telematics systems can be tapped into by machine control technologies to allow greater integration of the machine as a data provider within an operation. And for certain production machines that feature wear-intensive operation, telematics systems are becoming a vital tool for minimising maintenance costs by scheduling service intervals, maximising u
  • Using technology so assess road surface quality
    April 4, 2014
    Advances in survey technology and the evolving face of road procurement are driving demand for highway condition data. Mark Thomas, infrastructure services manager at Fugro Aperio writes how surveys of new roads can improve long-term quality While a growing suite of non-intrusive testing, measurement and survey technologies are widely used to target highway repairs and to determine asset management strategies, the use of these powerful tools remains patchy in the early stages of the infrastructure life cycl
  • Topcon unveils web-based construction management tool
    January 6, 2017
    Topcon is introducing Enterprise3D, a subscription web-based construction and engineering management tool which aids complete job site planning and scheduling. Reports from and to the system can be sent via Topcon’s sitelink3D.net web portal from anywhere in the world.