Skip to main content

Optimising investment and uptime

Tight deadlines, inclement weather, long travel times and inadequate tank capacity are a few of the challenges facing road marking contractors. But with the right equipment and careful planning, road marking contractors can optimise their investment and uptime, says Borum Industri. "Timing plays a key role in every road marking job. On new roads it is the last part of a project, and if there have been delays along the way, road marking contractors are under pressure to complete the job fast. On existing roa
February 8, 2012 Read time: 2 mins
Borum is now making more machines with a new dot and line system in response to demand
Tight deadlines, inclement weather, long travel times and inadequate tank capacity are a few of the challenges facing road marking contractors.

But with the right equipment and careful planning, road marking contractors can optimise their investment and uptime, says 173 Borum Industri.

"Timing plays a key role in every road marking job. On new roads it is the last part of a project, and if there have been delays along the way, road marking contractors are under pressure to complete the job fast. On existing roads, remarking can mean diversions for motorists, and at worst temporary road closures," says the Danish road marking equipment manufacturer.

With today's high traffic density, completing the job quickly is a must.

"To help my customers choose the right equipment, there are a number of important points to consider. One of the first, maybe surprisingly, is maintenance, which is a very important uptime parameter," says Lisbeth Knudsen, area sales manager at Borum.

In early 2010, Borum launched its LineMaster road marking computer, which is "designed to help operators control all road marking tasks, from line application and pre-marking to reporting and invoicing." Borum points out that tank capacity is alpha and omega for uptime and profitability, with road marking machines now so effective that they can empty a material tank very quickly.

"If using thermoplastic, this can mean having to wait for more material to melt and reach the correct temperature if the heating tank capacity for feeding the machine isn't large enough.

"Operators have told us that they can spend up to 25% of their daily working hours waiting for material to melt. But there are many small things that can be done do to help optimise investments." These include buying more melting capacity if the appropriate melting capacity is not on the feeder truck, and maximising current melting capacity, for example, by half emptying the tank and using the remaining hot material to melt incoming cold material.

For more information on companies in this article

Related Content

  • New asphalt paving technology being unveiled
    October 28, 2016
    So far 2016 has been an important year for asphalt paver development, with a huge array of improved designs coming to market - Mike Woof writes. With both the World of Asphalt and bauma exhibitions during 2016, it is perhaps no surprise that a wide array of new asphalt pavers have been unveiled. Major manufacturers have introduced new models in both US and European configurations. Ammann, Atlas Copco, BOMAG, Caterpillar, LeeBoy, Roadtec, Vögele and Volvo CE have all launched new pavers, either in European o
  • Road markings - simple, effective guidance
    February 15, 2012
    Road markings as a simple yet extremely effective method of guiding motorists safely on the world's road. Patrick Smith reports. Road markings are as important as road signs and give information about the roads being travelled on and actions that drivers should or should not be taking. For example, in many instances white lines often tell motorists something about the road: longitudinal lines can warn of situations that require action such as turn right, left or do not cross. Transverse lines often mean giv
  • Road user charging, the way to highway investment?
    February 27, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports
  • Road user charging, the way to highway investment?
    April 12, 2012
    Tough political decisions have to be made to ensure highway investment - *Dr Max Lay reports Our road systems and how we use them have changed dramatically over the last few centuries, and yet some problems persist and others reappear. For most of human history roads have been used by foot traffic and by cumbersome wagons hauled at walking pace. Roads were built to provide some obvious advantage in commerce or conquest. They were then grudgingly maintained by those who might gain some advantage from the