Skip to main content

Motorway's SolarLite

Motorists are already benefiting from greater visibility on a stretch of the M25 and between the M2 and M20 near the port of Dover, County Kent, south-east England, where Astucia SolarLite studs have been installed. Now drivers between junctions 3 and 6 on the M40 motorway heading north-west from the M25 out of London also benefit from the studs.
February 15, 2012 Read time: 2 mins
Drivers on the M40 motorway in the UK benefit from Astucia's SolarLite studs
Motorists are already benefiting from greater visibility on a stretch of the M25 and between the M2 and M20 near the port of Dover, County Kent, south-east England, where Astucia SolarLite studs have been installed.

Now drivers between junctions 3 and 6 on the M40 motorway heading north-west from the M25 out of London also benefit from the studs.

Astucia recently worked with 3005 Atkins and the 1441 UK Highways Agency to deploy SolarLite studs on the M40.

"SolarLite studs, unlike retroreflective cat's eyes, work intuitively, charging and activating from natural sunlight meaning they're a totally sustainable road safety solution. They also provide up to 900m of visibility: that's ten times greater than that of conventional studs," says 2696 Astucia.

The placement of the 7,000 studs was thoroughly considered. The stretches of road between junctions 3 and 4 and junctions 5 and 6 have been flagged as having perceived high rates of accidents due to the topography, road layout and lack of street lighting, thus the need for clearer road marking.

The Chiltern Hills escarpment, an Area of outstanding National Beauty, sit between junctions 5 and 6, and according to Astucia with the aid of eco-friendly SolarLite road studs, they are protected from pollution damage.

For more information on companies in this article

Related Content

  • New safer road workzone practices
    September 15, 2014
    In the UK, the construction business Connect Plus Services is implementing new practices that reduce the need for crossings of live carriageways. These practices are expected to save the lives of road construction workers. Connect Plus Services is the company that has the contract to maintain, operate and upgrade the M25 motorway around London over a 30-year period. The contract is carried out on behalf of the Highways Agency. The firm has developed a new method of managing traffic approaching road construc
  • New software makes road marking applications easier
    February 17, 2012
    Equipment, materials and testing combine to offer motorists better road markings as Patrick Smith reports Drivers realise that clear road markings, particularly in darkness and during the wet, are life-savers, offering guidance and direction. Manufacturers of marking materials, in-road studs, and testing and laying equipment have spent years perfecting solutions to make such markings easier to place; easier to see through the use of a variety of materials, and longer lasting. Sophisticated testing equip
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the