Skip to main content

Machines on the road

According to Danish road marking equipment manufacturer Borum, for road marking contractors completing a project on time and on budget requires the right machines, materials, and a skilled operator. "But, even with a great team and perfect road marking conditions, issues can arise that effect operations and require support. And that's when a road marking equipment supplier who can provide quick back-up, reliable service and onsite training is vital," says the company.
February 20, 2012 Read time: 3 mins
Graco's fast-melt thermoplastic striping system, the ThermoLazer ProMelt

According to Danish road marking equipment manufacturer Borum, for road marking contractors completing a project on time and on budget requires the right machines, materials, and a skilled operator.

"But, even with a great team and perfect road marking conditions, issues can arise that effect operations and require support. And that's when a road marking equipment supplier who can provide quick back-up, reliable service and onsite training is vital," says the company.

"With road marking machines becoming more sophisticated and projects more demanding, road marking equipment suppliers need a great support strategy in place for their customers. After-sales support and training are good to have, but in many situations that's no longer adequate: cultural insight and great teaching skills are equally important in building a strong customer-supplier relationship." Lars Mortensen, a service technician at Borum for ten years, has developed and assembled prototypes and worked on new equipment, and has travelled the world for the past nine years servicing equipment, training operators and sharing his industry knowledge.

Recently, 173 Borum sold its first machine to a Jamaican contractor, and he will be visiting the island on a training assignment.

"Needs differ from place to place. On a recent job, the operator and I had no common language, and he'd never sat behind the wheel of a car. That could seem like an impossible task to some, but with a little help from a translator and by managing our expectations, we made good progress," he says.

"It's easy to put a white line on a road. But it can take a few years to get really good, especially if you're working with thermoplastic material. If our customers have any kind of problem, we're there to help.

"It's best to get operators on the road as quickly as possible. For new contractors, on the job experience is vital. At times, there can be up to 50 people watching, which can be quite nerve-wracking for a new operator. So we put a lot of energy into making sure they feel at ease.

"Once that line is on the road it's not easy to remove it, so you need to be able to read the road, the computer and control the vehicle simultaneously. A good road marker is accurate and has a high application rate, and can maintain equipment." Striping system Meanwhile, Graco has introduced what it says is the world's first fast-melt, on-board thermoplastic striping system, the ThermoLazer ProMelt.

The system can melt 136kg of thermoplastic material on board in less than an hour with a one-man operation.

2869 Graco's attachable patented LineDriver connection system ("another industry first") extends the use of the ThermoLazer ProMelt system from a walk-behind to a ride-on system, while the company's EasyGlide Wheel Mount System with the FatTrack front-mounted swivel wheel and dual rear pneumatic air-filled tyres are said to make manoeuvring curves and turns easier, faster and safer.

"The ThermoLazer ProMelt System gives contractors a fast, safe, easier way to melt thermoplastic and increase productivity with less investment than before," says Tim Wehner, worldwide business development manager, Graco Contractor Equipment Division.

For more information on companies in this article

Related Content

  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un
  • HxGN Live 2014 attracts record event numbers
    August 28, 2014
    Attracting an HxGN Live event record-breaking 3,500 attendees, HxGN Live 2014 held at the MGM Grand in Las Vegas, US, June 2-5 showcased exciting new and in-demand design, measurement and visualisation technologies for industries including road construction and mining. Themed Great Stories Start Here, this year’s event also included a variety of exclusive presentations by industry experts, hands-on training, inspiring keynotes and international networking opportunities. Guy Woodford reports In
  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • Intelligence for compact construction machines
    November 13, 2024
    Trimble is delivering intelligence for compact construction machines.