Skip to main content

Machines on the road

According to Danish road marking equipment manufacturer Borum, for road marking contractors completing a project on time and on budget requires the right machines, materials, and a skilled operator. "But, even with a great team and perfect road marking conditions, issues can arise that effect operations and require support. And that's when a road marking equipment supplier who can provide quick back-up, reliable service and onsite training is vital," says the company.
February 20, 2012 Read time: 3 mins
Graco's fast-melt thermoplastic striping system, the ThermoLazer ProMelt

According to Danish road marking equipment manufacturer Borum, for road marking contractors completing a project on time and on budget requires the right machines, materials, and a skilled operator.

"But, even with a great team and perfect road marking conditions, issues can arise that effect operations and require support. And that's when a road marking equipment supplier who can provide quick back-up, reliable service and onsite training is vital," says the company.

"With road marking machines becoming more sophisticated and projects more demanding, road marking equipment suppliers need a great support strategy in place for their customers. After-sales support and training are good to have, but in many situations that's no longer adequate: cultural insight and great teaching skills are equally important in building a strong customer-supplier relationship." Lars Mortensen, a service technician at Borum for ten years, has developed and assembled prototypes and worked on new equipment, and has travelled the world for the past nine years servicing equipment, training operators and sharing his industry knowledge.

Recently, 173 Borum sold its first machine to a Jamaican contractor, and he will be visiting the island on a training assignment.

"Needs differ from place to place. On a recent job, the operator and I had no common language, and he'd never sat behind the wheel of a car. That could seem like an impossible task to some, but with a little help from a translator and by managing our expectations, we made good progress," he says.

"It's easy to put a white line on a road. But it can take a few years to get really good, especially if you're working with thermoplastic material. If our customers have any kind of problem, we're there to help.

"It's best to get operators on the road as quickly as possible. For new contractors, on the job experience is vital. At times, there can be up to 50 people watching, which can be quite nerve-wracking for a new operator. So we put a lot of energy into making sure they feel at ease.

"Once that line is on the road it's not easy to remove it, so you need to be able to read the road, the computer and control the vehicle simultaneously. A good road marker is accurate and has a high application rate, and can maintain equipment." Striping system Meanwhile, Graco has introduced what it says is the world's first fast-melt, on-board thermoplastic striping system, the ThermoLazer ProMelt.

The system can melt 136kg of thermoplastic material on board in less than an hour with a one-man operation.

2869 Graco's attachable patented LineDriver connection system ("another industry first") extends the use of the ThermoLazer ProMelt system from a walk-behind to a ride-on system, while the company's EasyGlide Wheel Mount System with the FatTrack front-mounted swivel wheel and dual rear pneumatic air-filled tyres are said to make manoeuvring curves and turns easier, faster and safer.

"The ThermoLazer ProMelt System gives contractors a fast, safe, easier way to melt thermoplastic and increase productivity with less investment than before," says Tim Wehner, worldwide business development manager, Graco Contractor Equipment Division.

For more information on companies in this article

Related Content

  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Sustainable Construction with Topcon
    February 7, 2024
    Michael Gomes, vice president of sustainability and corporate social responsibility at Topcon, talks to Mike Woof, editor of World Highways magazine, about the use of technology to deliver sustainability in road construction.
  • Quarry operators improve on productivity
    February 13, 2012
    With capital expenditure plans being reduced, many quarry operators are using the funds available to improve on productivity with their existing equipment fleets. Claire Symes reports. The economic downturn has had a big impact on the aggregates production sector with many quarry operators looking to reduce costs and rationalise operations. The impact of this can be seen in the reduction of capital expenditure plans but the investments that are being made are focused on efficiency.
  • Trimble’s vision of a far more efficient future
    July 5, 2021
    Trimble is offering a future with more efficient, optimised construction operations for faster project delivery