Skip to main content

LA gets Smartstud technology

In January, a US$3.2 million project saw the California Department of Transportation (Caltrans) in the USA start operating a dynamic lane in Los Angeles. The lane at the northbound Pasadena Freeway (SR-110) connector to the northbound Golden State Freeway (I-5) provides more capacity and provides congestion relief, and is the first of its kind to be introduced in the state. It operates as an optional connector lane during peak hours and a through-lane on SR-110 during general hours, and includes Smartstuds
February 8, 2012 Read time: 3 mins
3i Innovation's Smartstuds in use on a dynamic lane in Los Angeles, California, the first of its kind to be introduced in the state
In January, a US$3.2 million project saw the 2451 California Department of Transportation (Caltrans) in the USA start operating a dynamic lane in Los Angeles.

The lane at the northbound Pasadena Freeway (SR-110) connector to the northbound Golden State Freeway (I-5) provides more capacity and provides congestion relief, and is the first of its kind to be introduced in the state.

It operates as an optional connector lane during peak hours and a through-lane on SR-110 during general hours, and includes Smartstuds embedded in the road.

As well as helping to guide motorists when the number two lane is working as an optional lane to connect to I-5, the studs also transmit data that will help induce the switch from one lane to two, including sending messages to electronic roadway signs to alert motorists of the lane operation.

The studs are produced by New Zealand company 151 3i Innovation, which uses inductive power transfer (IPT) to power a range of products including the Smartstud and iiiLevel (eye-level) LED road markers.

The technology, whose potential was originally recognised by researchers at Auckland University, New Zealand in the 1970s, was developed by SmartStud. This brand, with the relevant technology patents and manufacturing expertise, was acquired by 3i Innovation in 2008, and the company then spent two years developing iiilevel, which it claims is the world's first low profile, inductively powered, intelligent road marker.

IPT converts magnetic energy to electrical energy, which allows them to function independently from a fixed-cable system. Energy is delivered by a central cable that emits a magnetic field, but the studs do not need to be fixed by electrical wire to harness the electricity and are thus wireless.

3i claims that key benefits of the technology are that it is waterproof, meaning no corrosion; high energy efficiency; environmentally friendly; high safety rating; easy installations, and fast and easy maintenance.

The low-level, flush-mounted iiilevel stud is made from high-tech polycarbonates and uses energy efficient LEDs as does the Smartstud, which it is claimed is visible in sun, dark, fog or rain up to 2km away. Both products offer patented two-way communication and diagnosis capabilities.3i's studs were also used in Santa Monica's McClure Tunnel in 2003 to illuminate the freeway's centre divider and more recently at Germany's 8km Rennsteig Tunnel, which required 32km of the lights in four lines.

For more information on companies in this article

Related Content

  • Streetlight control with Urban Node 324
    April 25, 2022
    Each Urban Node 324 Cellular city streetlight LED luminaire controller includes the Nordic Semiconductor nRF9160 multi-mode NB-IoT/LTE-M System-in-Package (SiP) and plugs into an industry-standard Zhaga LED lighting socket.
  • Traffic monitored by Fabema
    February 10, 2012
    Fabema GmbH is offering a new and more sophisticated solution for monitoring traffic flows, with its FMC-N multi-functional control that can be used during traffic jams, allowing the user to monitor phase changes from a PC. The unit, for both temporary and stationary use, suits installations with traffic signal systems featuring up to 32 signal groups and 256 signal lamps.
  • Final beam for Gerald Desmond Bridge replacement
    May 1, 2020
    The US$1.47 billion project was started in 2013 and open later this year.
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h