Skip to main content

Growth of thermoplastic road marking manufacture

PROMAX Industries has now broadened its worldwide presence with the establishment of a production facility in Sri Lanka. The firm now has a deal with a local firm for a thermoplastic production plant using the PROMAX CF02 system. The partner for this facility is TDP Products in Kahawala, Padukka. The Sri Lankan producer was set–up by TD Priyantha who has been planning for some time to start manufacturing road marking products for the Sri Lankan market. TDP Products and
February 24, 2012 Read time: 3 mins
A team from PROMAX Industries was on hand to help commission the new thermoplastic manufacturing plant for TDP Products in Sri Lanka

PROMAX Industries has now broadened its worldwide presence with the establishment of a production facility in Sri Lanka.

The firm now has a deal with a local firm for a thermoplastic production plant using the PROMAX CF02 system. The partner for this facility is TDP Products in Kahawala, Padukka. The Sri Lankan producer was set–up by TD Priyantha who has been planning for some time to start manufacturing road marking products for the Sri Lankan market. TDP Products and 2445 PROMAX Industries started this project in January 2011 and already now the production has been successfully established, having an annual capacity above 5000tonnes of high quality TDP Thermo-line thermoplastic.

The materials have passed the requirements of the Sri Lanka government laboratory, including full scale trials, while following guidelines and standards on product development and use. The use of TDP Thermo-line thermoplastic road marking materials in Sri Lanka is helping development and brings added environmental and economic benefits according to the firm. Development of innovative road marking material based on local raw materials, ensures reduced reliance on expensive imported raw materials. This also reduces transportation of materials and cuts project delays arising from shortages of materials.

PROMAX has considerable experience producing thermoplastic products for its home market and has broadened its manufacturing capabilities in recent years. Since 2005 PROMAX has supplied the CF03 Thermoplastic Production Plant to customers in Belarus, Sweden, Iran, Portugal and Russia. This is a sophisticated thermoplastic manufacturing system for road marking material that is built on modular lines. This system allows the firm to assemble the plant and commission it in just five working days. The plants can be installed in the small manufacturing facilities as they are compact and efficient and only require an electrical power supply once installed.

The CF03 plant is able to produce more than 500 thermoplastic compounds and can be supplied with an advanced batch production control and registration system. PROMAX can also offer a range of services for thermoplastic production including project management, site management solutions and quality control and development. This system allows customers the possibility of a consistent and fast return of the investment and the possibility to fully control the quality of the thermoplastic compounds and the production development.

The CF03 plant weighs 28tonnes and measures 26.6m long by 2.5m wide and 5.6m high, with a computerised PLC control package. This plant features 32m3 tanks and produces 1tonne of material/batch in a 12-15 minute production cycle, allowing an output of around 4tonnes/hour.

For more information on companies in this article

Related Content

  • XCMG boosting capacity
    November 26, 2012
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • Pothole and marking options
    February 21, 2012
    Ennis Prismo Traffic Safety Solutions now has a quick solution to pothole patching problems and temporary road marking needs.
  • Green asphalt options from Ammann's new plants
    March 6, 2024
    Ammann is offering innovative advances for the asphalt plant segment - Mike Woof writes
  • Engine manufacturers meeting emissions deadlines
    February 10, 2012
    Engine manufacturers have had to jump through regulatory hoops in recent years, meeting requirements for diesels with ever cleaner exhaust emissions. When this programme was first proposed, many believed the final aims could not be achieved. However on January 1st 2011, the Tier 4 Interim/Stage IIIB emissions regulations will come into force in North America and Europe and all the major diesel manufacturers will have suitable products at the ready. The Tier 4 Interim/Stage IIIB emissions regulations require