Skip to main content

Fast drying road marking for all surfaces

Ennis Prismo continues to expand its range of road marking products with the addition of two new solutions. One is used to form temporary markings and the other to provide more permanent lines. The two products are known as Easymark Temporary and Easymark Permanent respectively. These fast drying aerosols can be used in car parks and on roads and are non harmful to the environment and aquatic life. Both Easymark products can be used on a range of surfaces including asphalt, concrete, metal and timber. Compe
February 15, 2012 Read time: 2 mins

1394 Ennis Prismo continues to expand its range of road marking products with the addition of two new solutions. One is used to form temporary markings and the other to provide more permanent lines.

The two products are known as Easymark Temporary and Easymark Permanent respectively. These fast drying aerosols can be used in car parks and on roads and are non harmful to the environment and aquatic life. Both Easymark products can be used on a range of surfaces including asphalt, concrete, metal and timber. Competitively-priced, these line markings have been specifically designed to cater for longer term, or short term performance. Easymark Permanent will produce distinctive lines that are expected to last 6-12 months, depending upon the traffic volumes. Clean, accurate lines can be achieved with the two, or four wheel applicators, while the marker is resistant to most chemicals and is chlorofluorocarbon (CFC) free.

Easymark Temporary is formulated specifically for creating shortterm, low-cost markings that will fade after some six weeks, again depending upon traffic volumes.

This product is suited for creating provisional markings in areas where low wear applications are required or where markings are required to fade or disappear shortly after work has been completed, eliminating the need for mechanical removal.

If required, Easymark Temporary markings can be removed instantly with a pressure hose and brush.

Both are available in six colours; white, yellow, blue, red, green and black. Each 750ml aerosol has sufficient capacity to form a 100m long line at a width of 50mm.

Both can be applied by applicator or hand and in conjunction with stencil kits, can also be used to form letters and numbers.

For more information on companies in this article

Related Content

  • Paschal’s high-performance NeoR formwork is no lightweight solution
    October 26, 2022
    Less weight and better performance levels are the prime features of Paschal’s new NeoR formwork system for smaller projects.
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Simex unveils GEN II of ART 1000 asphalt regeneration tech
    March 6, 2025

    Simex has released the new GEN II version of its ART 1000 patented technology for in-situ regeneration of deteriorated asphalt.

    Simex ART technology focuses on surface-level interventions for the functional recovery of road deterioration. It does not require the removal of milled material or the addition of virgin bituminous mix, instead utilising only the existing on-site material. Most importantly, it avoids the complete interruption of vehicular traffic, ensuring the road is immediately passable after restoration.

  • New tunnelling technology saves time
    February 15, 2012
    New tunnelling technology from BASF has helped cut construction time on a major tunnel project in Australia. The system has been used to speed waterproofing, an important point as the link runs underneath one of Australia's major rivers. The spray-applied polymer membrane provided by a BASF sprayed concrete machine saved time and effort on the construction of the Clem Jones 7 Tunnel (Clem 7) in Brisbane, Australia. The 4.8km tunnel was completed seven months ahead of schedule and at its lowest point Clem 7