Skip to main content

Fast drying road marking for all surfaces

Ennis Prismo continues to expand its range of road marking products with the addition of two new solutions. One is used to form temporary markings and the other to provide more permanent lines. The two products are known as Easymark Temporary and Easymark Permanent respectively. These fast drying aerosols can be used in car parks and on roads and are non harmful to the environment and aquatic life. Both Easymark products can be used on a range of surfaces including asphalt, concrete, metal and timber. Compe
February 15, 2012 Read time: 2 mins

1394 Ennis Prismo continues to expand its range of road marking products with the addition of two new solutions. One is used to form temporary markings and the other to provide more permanent lines.

The two products are known as Easymark Temporary and Easymark Permanent respectively. These fast drying aerosols can be used in car parks and on roads and are non harmful to the environment and aquatic life. Both Easymark products can be used on a range of surfaces including asphalt, concrete, metal and timber. Competitively-priced, these line markings have been specifically designed to cater for longer term, or short term performance. Easymark Permanent will produce distinctive lines that are expected to last 6-12 months, depending upon the traffic volumes. Clean, accurate lines can be achieved with the two, or four wheel applicators, while the marker is resistant to most chemicals and is chlorofluorocarbon (CFC) free.

Easymark Temporary is formulated specifically for creating shortterm, low-cost markings that will fade after some six weeks, again depending upon traffic volumes.

This product is suited for creating provisional markings in areas where low wear applications are required or where markings are required to fade or disappear shortly after work has been completed, eliminating the need for mechanical removal.

If required, Easymark Temporary markings can be removed instantly with a pressure hose and brush.

Both are available in six colours; white, yellow, blue, red, green and black. Each 750ml aerosol has sufficient capacity to form a 100m long line at a width of 50mm.

Both can be applied by applicator or hand and in conjunction with stencil kits, can also be used to form letters and numbers.

For more information on companies in this article

Related Content

  • Peri raises its game with hydraulic cylinder for UP Rosett props
    January 6, 2017
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
  • Caterpillar C series articulated dump trucks move with the times
    May 19, 2015
    Caterpillar has raised the bar for articulated dump truck performance with the introduction of its C Series to replace its B series ADTs. All the new Cat 735C, 740C EJ and 745C ADTs have engines that meet US EPA Tier 4 Final/EU Stage IV emissions standards. The machines also incorporate many new and upgraded features designed to boost the operator’s efficiency, ensure a longer life cycle of the vehicle and save fuel. Rated payload capacities for the new models are 32.7tonnes for the 735C, 38tonnes for the 7
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • Paving a new racing circuit
    February 2, 2022
    The use of reduced temperature asphalt in a road construction project in Germany has helped to lower emissions