Skip to main content

Call for action on road markings

In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves. Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028. Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough
March 16, 2012 Read time: 2 mins
In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves.

Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028.

Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough for traffic measures, which are due to be examined.

These include calls for double yellow lines, parking restrictions, disabled parking bays, school keep clear marks and waiting time restrictions.

Speaking to the Staffordshire Newsletter, County Councillor Len Bloomer said: “I worked out it will be 2028 before we clear the backlog. I could quite easily go round my patch and add another six. The list is too big. Something has got to be done about it.”

It is reported that Stafford Borough and Staffordshire County councillors intend to lobby the Government for a change in legislation to cut red tape surrounding traffic management orders.

Related Content

  • UK sees accidents rise
    July 12, 2012
    Fifty local councils in England saw more than a ten per cent increase in killed and seriously injured (KSI) crash rates between 2010 and 2011, according to an Institute for Advanced Motorists (IAM) analysis of the new road accident figures. The biggest increases in KSI numbers were in St Helens – 62 per cent, Portsmouth – 57 per cent, Stoke on Trent – 57 per cent, and Coventry – 51 per cent. A further 76 councils saw increases in the KSI rate above the national average of two per cent.
  • Efficient excavation technology from Trimble
    March 8, 2017
    Trimble is introducing its new Earthworks package at CONEXPO-CON/AGG 2017. This is a major development for the firm, as Jeff Drake, business area manager for machine control systems explained, “We’re bringing out our new machine control platform.”
  • New bitumen technologies and developments around the world
    May 16, 2016
    From expanding bitumen operations in India to groundbreaking mixes in Italy, stronger roads in South Africa to high RAP content in Germany, this month we bring you stories of advancing technology from around the world - Kristina Smith reports Technology from Austrian engineering company Pörner will soon be responsible for almost two-thirds of India’s bitumen production. In December last year Pörner signed the deal with HPCL-Mittal Energy, a joint venture of Hindustan Petroleum Corporation and Mittal Energy
  • Fast drying road marking for all surfaces
    March 19, 2012
    Ennis Prismo continues to expand its range of road marking products with the addition of two new solutions. One is used to form temporary markings and the other to provide more permanent lines. The two products are known as Easymark Temporary and Easymark Permanent respectively. These fast drying aerosols can be used in car parks and on roads and are non harmful to the environment and aquatic life. Both Easymark products can be used on a range of surfaces including asphalt, concrete, metal and timber. Compe