Skip to main content

Call for action on road markings

In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves. Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028. Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough
March 16, 2012 Read time: 2 mins
In Staffordshire, in the West Midlands region of England, some residents are reported to be so fed-up of waiting for traffic lines to be painted on roads by the local county council that they are threatening to do it themselves.

Staffordshire County Council highways bosses say they can only take on four new traffic measure projects a year and have a waiting list stretching to 2028.

Media outlets in the county report that the local authority currently has more than 70 requests from all over Stafford borough for traffic measures, which are due to be examined.

These include calls for double yellow lines, parking restrictions, disabled parking bays, school keep clear marks and waiting time restrictions.

Speaking to the Staffordshire Newsletter, County Councillor Len Bloomer said: “I worked out it will be 2028 before we clear the backlog. I could quite easily go round my patch and add another six. The list is too big. Something has got to be done about it.”

It is reported that Stafford Borough and Staffordshire County councillors intend to lobby the Government for a change in legislation to cut red tape surrounding traffic management orders.

Related Content

  • UK universities' research shows potholes can be fixed better
    February 14, 2013
    Academic research by two UK universities shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. An initial study - undertaken by Nottingham Trent University and the University of Nottingham in central England– found that the application of a coat of bitumen emulsion between two layers of asphalt in a clean, dry repair, greatly improved its resistance to further cracks. It was also confirmed that a hot mix repair – in which asphalt is heated to 140°C
  • Caterpillar meets the challenges
    February 14, 2012
    Roads in south-eastern France and those on the west coast of Spain share a common challenge often faced by road construction crews around Europe: extremely tight working conditions. According to Caterpillar, such conditions create construction demands that can affect traffic flow, the preservation of historic structures and even the ability to resurface these narrow roads that, in some cases, have been around for centuries. Add to these challenging working conditions, the mountainous terrain found in the Al
  • Meet Die Autobahn des Bundes
    November 8, 2021
    Only recently has Germany created a central organisation to maintain and develop the nation’s 13,200km of motorways, called autobahns. Moving from 16 state-run operation centres to one lead centre is a challenge but essential, says Gerd Riegelhuth.
  • New opportunities for connected construction technology
    June 20, 2025

    Trimble is one of the leaders in the field for connected construction technology, with an impressive share of the market as well as a reputation for delivering some of the most sophisticated solutions. The company is keen to retain its role as a leader and is also reinforcing its position in key market segments.