Skip to main content

Work recommencing on stalled Portuguese tunnel

In Portugal work is restarting on the stalled Marao tunnel project. The Portuguese Government has assured financing from the EU to complete the necessary work for the 5.7km tunnel. The contractor working on the project originally hit financial problems, resulting in the work grinding to a halt and the Portuguese Government cancelling the contract with the original concession holder. The cost of the project has estimated at €204 million and the EU may finance up to €200 million of this. The package of works
February 27, 2014 Read time: 1 min
In Portugal work is restarting on the stalled Marao tunnel project. The Portuguese Government has assured financing from the EU to complete the necessary work for the 5.7km tunnel. The contractor working on the project originally hit financial problems, resulting in the work grinding to a halt and the Portuguese Government cancelling the contract with the original concession holder. The cost of the project has estimated at €204 million and the EU may finance up to €200 million of this. The package of works necessary includes four contracts for the design and construction, two civil engineering contracts and one to implement a toll charging system. In addition the concession may imply an investment of €400 million for a 30 year concession package.

Related Content

  • Bosnia Herzegovina road and tunnel works underway
    March 3, 2022
    Road and tunnel works are underway in Bosnia Herzegovina.
  • Atlanta SR 400 Express Lanes project awarded
    September 2, 2024
    The 20km project, awarded by the Georgia Department of Transportation in the US, went to the SR 400 Peach Partners, that includes ACS, Acciona and Meridiam.
  • Construction industry bodies call for infrastructure investment in Europe
    May 18, 2012
    The European construction contractors and equipment manufacturers associations (the FIEC and CECE respectively) are calling for increased spending on infrastructure in a bid to stimulate economic growth. “Our industry looks forward to the implementation of the right policies and incentives to nurture sustainable growth and jobs”, said Ralf Wezel, CECE secretary general, during a recent debate organised by the European Forum for Manufacturing (EFM) in the European Parliament.
  • Ed Zublin to start Kriegsstraße car tunnel work in Karlsruhe
    April 28, 2017
    Construction officially started on a two-lane 1.6km road tunnel in the centre of the German city of Karlsruhe. In December, the Stuttgart-based civil engineering subsidiary Ed Züblin announced that it is leading a consortium with Schleith to build the Kriegsstraße car tunnel in the German city of Karlsruhe. Ed Zublin is now a wholly owned subsidiary of the Austria-based contractor Strabag. The tunnel in Kriegsstraße is the second part of the Kombilösung public transport infrastructure project to reduce the