Skip to main content

Work recommencing on stalled Portuguese tunnel

In Portugal work is restarting on the stalled Marao tunnel project. The Portuguese Government has assured financing from the EU to complete the necessary work for the 5.7km tunnel. The contractor working on the project originally hit financial problems, resulting in the work grinding to a halt and the Portuguese Government cancelling the contract with the original concession holder. The cost of the project has estimated at €204 million and the EU may finance up to €200 million of this. The package of works
February 27, 2014 Read time: 1 min
In Portugal work is restarting on the stalled Marao tunnel project. The Portuguese Government has assured financing from the EU to complete the necessary work for the 5.7km tunnel. The contractor working on the project originally hit financial problems, resulting in the work grinding to a halt and the Portuguese Government cancelling the contract with the original concession holder. The cost of the project has estimated at €204 million and the EU may finance up to €200 million of this. The package of works necessary includes four contracts for the design and construction, two civil engineering contracts and one to implement a toll charging system. In addition the concession may imply an investment of €400 million for a 30 year concession package.

Related Content

  • Chinese firm wins highways expansion project to decongest Nairobi
    January 5, 2017
    A Chinese contractor is carrying out a major road project intended to cut congestion in Kenyan capital Nairobi – Shem Oirere writes Chinese contractor China Wu Yi has won a US$163 million contract for the reconstruction and expansion of a 25km highway leading out of Kenya’s capital Nairobi with financing from the World Bank. The contract was awarded by the country’s National Highways Authority (KeNHA), a state-owned road agency responsible for the management, development, rehabilitation and maintenance of i
  • Portuguese toll plan makes strong start
    December 17, 2012
    Around 72,500 foreign drivers have already registered for the electronic toll payment system set up at motorways which connect to the Spanish border, according to Portuguese road agency (Estradas de Portugal-EP). Implemented on 1 July, 2012, the ‘Easy Toll’ system is a pre requirement to drive on SCUT motorways. Within the overall registration total, 30,961 have registered for the ‘Easy Toll’ on the A25 motorway, connecting Aveiro and Vila Formoso. Using a banking payment card, drivers can associate the cha
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • AtkinsRéalis wins Île d’Orléans Bridge work
    May 2, 2024
    VIDEO: The new US$1.96 billion replacement Île d’Orléans Bridge near Quebec city, Canada, will feature two wider lanes of traffic, shoulders, multi-use lanes for pedestrians and cyclists as well as redevelopment of a major interchange and creation of green spaces.