Skip to main content

UK Government finalising plans for Stonehenge road tunnel

The UK Government is finalising its plans for the construction of a road tunnel close to the famous Stonehenge monument in Wiltshire. The 2.9km tunnel will carry the A303, a busy road that carries heavy traffic, particularly during the holiday season when large numbers of tourists pass through the area. The existing route passes close to the Stonehenge monument but the road is widely recognised as being unfit for purpose. As well as carrying cars, it handles a high percentage of large trucks, including heav
January 12, 2017 Read time: 3 mins
The UK Government is finalising its plans for the construction of a road tunnel close to the famous Stonehenge monument in Wiltshire. The 2.9km tunnel will carry the A303, a busy road that carries heavy traffic, particularly during the holiday season when large numbers of tourists pass through the area. The existing route passes close to the Stonehenge monument but the road is widely recognised as being unfit for purpose. As well as carrying cars, it handles a high percentage of large trucks, including heavy transporters carrying vehicles and equipment to and from the military bases in the area. Congestion can be acute and the two lane stretch running through a village close to Stonehenge is notorious for frequent delays, as well as being the cause of concern over its safety.

Building a new dual carriageway on the surface past the site would in no way be acceptable due to the presence of many smaller archaeological sites in the area around Stonehenge, a number of which have not so far been investigated. It is also known that there may be several archaeological sites close at hand that have not so far been discovered.

A tunnel has been proposed for this section of road on several occasions, with the first plan for a cut and cover tunnel being put forward in the 1990s but this was rejected due to the harm it would cause. A longer bored tunnel was then put forward in 2002 but after a number of revisions, it was also cancelled due to its high cost in 2007.

Unfortunately, the high cost of this tunnel is unavoidable as the geology of the stretch through which the tunnel is planned to run is poor, with fragmented rock and a high water table. It will need extensive structural support using concrete, as well as considerable drainage to meet the latest environmental requirements. The tunnel forms part of a £2 billion project to upgrade the A303 to dual carriageway status for its entire length.

The tunnel project has not been without controversy however. Some claim that building the 2.9km tunnel will threaten the archaeology of the area. Although the tunnel has been approved by the National Trust, the UK body responsible for preserving monuments such as Stonehenge, another group called Stonehenge Alliance is calling for a 4.7km tunnel to be built so as to preserve the archaeology. Given the additional cost this proposal is unlikely to be realised, but the construction of the 2.9km tunnel will still have hurdles to pass before it can get the official go ahead.

Related Content

  • VIDEO: UN body protests England’s planned Stonehenge A303 tunnel
    May 1, 2018
    The Paris-based International Council on Monuments and Sites – Icomos- has objected to plans by Highways England for a road tunnel bedside the ancient monument Stonehenge. Icomos, which advises the United Nations on protection of world heritage sites, has written to Highways England urging a rethink of the planned tunnel that would be just under 3kmk long. It argues that the tunnel and the dualling of the A303 carriageways either side would damage the landscape and destroy archaeological evidence
  • UK announces details of major road building programme
    December 1, 2014
    Details of a major programme of road building projects have been unveiled by the UK Government. The plan envisages some €18.83 billion (£15 billion) being spent on constructing new road links and upgrading existing routes. This is the largest single programme of works for the UK’s road network for several decades. The plan includes 100 major projects, perhaps the most notable being the long-awaited tunnel for the A303 past the Stonehenge archeological site. The existing route is narrow at this point and suf
  • €17 billion for military road upgrades
    August 8, 2025
    Europe will invest €17 billion in roads to handle heavy for military traffic.
  • Stonehenge Tunnel showing real progress
    October 12, 2017
    According to Highways England, real progress is being seen with the Stonehenge Tunnel project. The UK Government recently announced its plans to construct a twin-bored tunnel measuring around 2.9km for the A303, bypassing historic Stonehenge. The project also includes a section of dual carriageway bypass for Winterbourne Stoke. This scheme forms part of a £2 billion investment in the South West's strategic road network. The project is intended to improve connectivity and ease congestion on this key route.