Skip to main content

Thailand highway bidding process opening

Tenders for two expressway projects in Thailand will open by mid-2018. The projects are worth around US$1.5 billion in all. The tender process is being handled by the Expressway Authority of Thailand (Exat). Construction of one of the expressways should commence by late 2018 and the route would then be open to traffic by the end of 2021, if all goes to plan. The 10.5km expressway will connect the N2 Nawamin Road with the Kasetsart intersection and will be tolled, with a project traffic volume of 80,000
October 12, 2017 Read time: 1 min

Tenders for two expressway projects in Thailand will open by mid-2018. The projects are worth around US$1.5 billion in all. The tender process is being handled by the Expressway Authority of Thailand (Exat). Construction of one of the expressways should commence by late 2018 and the route would then be open to traffic by the end of 2021, if all goes to plan. The 10.5km expressway will connect the N2 Nawamin Road with the Kasetsart intersection and will be tolled, with a project traffic volume of 80,000 vehicles/day. The second expressway project will measure 17km long.

Related Content

  • Major Chinese road tenders are opening for bids
    October 26, 2023
    Major Chinese road project tenders are now opening for bids.
  • US$19.4 billion for Thailand’s transport development
    February 15, 2024
    A US$19.4 billion plan is being set for Thailand’s transport development programme.
  • UAE highway first section opening to traffic
    July 16, 2018
    A new highway section is now open to traffic in the UAE. This highway is designed to connect the north and south of Ras Al Khaimah emirate, extending from the Emirates Road. The new highway features three lanes in either direction, with a maximum speed limit of 140km/h and is designed to carry up to 60,000 vehicles/day. Featuring 10 intersections the Ras Al Khaimah Ring Road will measure 30km-long when complete. Work is being carried out on a number of bridges along the route with the rest of the highway li
  • Texas toll road opening in 2018
    December 15, 2017
    Work on the 360 Tollway in the US State of Texas should be complete in 2018. The link measures 15.5km long and runs between US287 and Camp Wisdom Road. The project is expected to have cost US$340 million once the work has been fully completed. Building work for the route commence in 2015 and the new link is intended to reduce traffic congestion in the Arlington area, lowering journey times for drivers.