Skip to main content

Thailand highway bidding process opening

Tenders for two expressway projects in Thailand will open by mid-2018. The projects are worth around US$1.5 billion in all. The tender process is being handled by the Expressway Authority of Thailand (Exat). Construction of one of the expressways should commence by late 2018 and the route would then be open to traffic by the end of 2021, if all goes to plan. The 10.5km expressway will connect the N2 Nawamin Road with the Kasetsart intersection and will be tolled, with a project traffic volume of 80,000
October 12, 2017 Read time: 1 min

Tenders for two expressway projects in Thailand will open by mid-2018. The projects are worth around US$1.5 billion in all. The tender process is being handled by the Expressway Authority of Thailand (Exat). Construction of one of the expressways should commence by late 2018 and the route would then be open to traffic by the end of 2021, if all goes to plan. The 10.5km expressway will connect the N2 Nawamin Road with the Kasetsart intersection and will be tolled, with a project traffic volume of 80,000 vehicles/day. The second expressway project will measure 17km long.

Related Content

  • Thailand motorway link now being planned
    August 30, 2019
    A new 18km motorway link is being planned in Thailand that will cost an estimated US$1.2 billion. The highway will be an extension of the existing Don Muang Tollway. This will provide an improved connection between the existing M5 and M6 motorways as well as Nakhon Ratchasima, lying to the north east of capital Bangkok. The tender process for this 18km tollway extension project is expected in 2021, with two contracts being offered. The project is likely to be handled under the PPP model, with actual constru
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Nepal's new pedestrian bridges
    March 22, 2012
    Improved pedestrian safety and smoother traffic flow will result from work being carried out by Nepal’s Department of Roads. The plan will see the construction of 15 pedestrian bridges along the Tinkune-Suryabinayak section of the Araniko Highway.
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.