Skip to main content

Road repair and maintenance programme for Mexico

A budget of US$5 billion has been set for road construction, maintenance and modernisation projects in Mexico during 2014. The programme has been set out by the Secretariat of Transport and Communications (SCT), which published 2,191 tenders by March 2014 and expects 80% of resources to be tendered by May 2014. The projects include the Indios Verdes-Santa Clara viaduct, works to 300km of rural and agricultural roads in Quintana Roo and pavement restoration in Benito Juarez. Also included are the Mexico-Pue
April 10, 2014 Read time: 2 mins
Investment will develop Mexico’s highway network and reduce chronic congestion in and around major urban areas
A budget of US$5 billion has been set for road construction, maintenance and modernisation projects in Mexico during 2014. The programme has been set out by the Secretariat of Transport and Communications (SCT), which published 2,191 tenders by March 2014 and expects 80% of resources to be tendered by May 2014. The projects include the Indios Verdes-Santa Clara viaduct, works to 300km of rural and agricultural roads in Quintana Roo and pavement restoration in Benito Juarez.  Also included are the Mexico-Puebla elevated viaduct, the first stage of the Tampico-Ciudad Victoria project and the Sonora by-pass. The funds will allow the SCT to complete construction and modernisation projects on over 2,700km of roads, including 2,356 federal roads and 366 motorways.

However, Mexico’s road building programme could be hit hard by insufficient asphalt supplies. Bot construction companies and asphalt distributors have warned that the country is suffering a 20% shortage of the material. The shortage began to bite in November 2013 and is due in part to insufficient supplies from state-run oil company Petroleos Mexicanos (Pemex). This could delay road maintenance projects by up to 30%. Asphalt represents up to 60% of the value of such projects, according to national asphalt association AMAAC and construction sector chamber CMIC, so the shortage is a significant issue.

Both organisations have warned that the 2014 road project agenda, 27% larger than the 2013 programme, will be affected by the asphalt shortage. However Pemex has justified the shortage saying it is producing a higher quality product, and has assured AMAAC that supplies will be back to 100% in a couple of months to satisfy Mexico's 2 million tonne/year demand. In the mean-time, CMIC has asked Pemex to increase its asphalt production in response to the problem. Another reason for the shortage is down to higher demand than usual, because production at the Salamanca refinery in Guanajuato is 40% higher than projected. In February 2014, daily asphalt sales were 104% higher than in the year-ago period. Several major road projects have started recently, which has been a factor in the current situation.
SCT alone has a budget for road projects in 2014 which is 27% larger than in 2013.

Related Content

  • Mobility for Mexico
    May 3, 2012
    Urban mobility is high on the infrastructure agenda in Mexico. While highways continue to be a priority, capital Mexico City and other large cities across the country are looking to implement mass transport systems such as bus rapid transit (BRT) lines.
  • Mobility for Mexico
    March 22, 2012
    Urban mobility is high on the infrastructure agenda in Mexico. While highways continue to be a priority, capital Mexico City and other large cities across the country are looking to implement mass transport systems such as bus rapid transit (BRT) lines.
  • El Sillar – Bolivia’s challenging road project
    February 6, 2020
    Construction of Bolivia’s El Sillar highway, the country’s most complicated road project – Mauro Nogarin reports
  • Brazil infrastructure projects being privatised?
    May 18, 2015
    The Brazilian Government is considering increasing the number of projects being privatised in a bid to boost investment in the country. Brazilian president Dilma Rousseff has suggested increasing the number of federal roads included in the privatisation programme from four to 11. The economic team has presented 20 new road stretches to be considered for inclusion in the programme. These routes will be studied in order to determine which will generate the most interest from the private sector, with six or se